Answer:
<em>The crane lifts the crate up to 76 m high</em>
Explanation:
<u>Work Done by a Force</u>
The work done by a force of magnitude F that displaces an object by a distance y is given by

We know a crane does a work of 9,500 Joule to lift a crate and is using a force of 125 Nw.
The above equation can be solved to know the value of y in terms of the work and the force:

Plugging in the given values


The crane lifts the crate up to 76 m high
If solid, cold metal like brass doesn't melt at room temperature like ice does, than the bass can stand much more heat then a ice cube, so it needs to be hotter to melt, so the melting point of ice is lower then brass's melting point
D? maybe i’m trying to. see if it’s d or b
Answer:
What is a Free Body Diagram?
The free body diagram helps you understand and solve static and dynamic problem involving forces. It is a diagram including all forces acting on a given object without the other object in the system. You need to first understand all the forces acting on the object and then represent these force by arrows in the direction of the force to be drawn.
Explanation:
Answer:
The final speed of the crate is 12.07 m/s.
Explanation:
For the first 10.0 meters, the only force acting on the crate is 225 N, so we can calculate the acceleration as follows:


Now, we can calculate the final speed of the crate at the end of 10.0 m:
For the next 10.5 meters we have frictional force:


So, the acceleration is:
The final speed of the crate at the end of 10.0 m will be the initial speed of the following 10.5 meters, so:
Therefore, the final speed of the crate after being pulled these 20.5 meters is 12.07 m/s.
I hope it helps you!