Answer:
100 pennies
Step-by-step explanation:
each stack is 10 pennies. brad has 4 stacks which equal 40 and has 6 more stack which qual 60. 40+60=100
Answer:
Future value of annuity (FV) = $13,782.12 (Approx)
Step-by-step explanation:
Given:
Periodic payment p = $500
Interest rate r = 13% = 13%/4 = 0.0325 (Quarterly)
Number of period n = 5 x 4 = 20 quarter
Find:
Future value of annuity (FV)
Computation:
![Future\ value\ of\ annuity\ (FV)=p[\frac{(1+r)^n-1}{r} ] \\\\Future\ value\ of\ annuity\ (FV)=500[\frac{(1+0.0325)^{20}-1}{0.0325} ] \\\\Future\ value\ of\ annuity\ (FV)=13,782.1219 \\\\](https://tex.z-dn.net/?f=Future%5C%20value%5C%20of%5C%20annuity%5C%20%28FV%29%3Dp%5B%5Cfrac%7B%281%2Br%29%5En-1%7D%7Br%7D%20%5D%20%5C%5C%5C%5CFuture%5C%20value%5C%20of%5C%20annuity%5C%20%28FV%29%3D500%5B%5Cfrac%7B%281%2B0.0325%29%5E%7B20%7D-1%7D%7B0.0325%7D%20%5D%20%5C%5C%5C%5CFuture%5C%20value%5C%20of%5C%20annuity%5C%20%28FV%29%3D13%2C782.1219%20%5C%5C%5C%5C)
Future value of annuity (FV) = $13,782.12 (Approx)
Step-by-step explanation:
What are two different ways you could find the value of a? Explain these methods. A right triangle is shown. An altitude is drawn from the right angle to the opposite side to form 2 line segments with lengths 9 and 16. The length of the other 2 sides are 15 and a....done
5 times when all 5 times are up its 7:30 which if 3/4 of a hour which is 45 and is that time4learning?
Answer:
down ⬇⬇⬇
Step-by-step explanation:
5. its all of them so just write A, B, C, D, E, F, G
6. (equilateral) triangle, right triangle, diamond (?), parallelogram
7. C and E; A and B
8. not so sure about this one but i think its regular
9. its not a polygon because polygons have straight sides, and this figure does not.
10. the only polygon is C
pay attention in school, it'll help in the long run. even if it sounds boring, it will come in handy one day!!
hope this helped <33333