Answer:
true
Explanation:
Creep is known as the time dependent deformation of structure due to constant load acting on the body.
Creep is generally seen at high temperature.
Due to creep the length of the structure increases which is not fit for serviceability purpose.
When time passes structure gain strength as the structure strength increases with time so creep tends to decrease.
When we talk about Creep rate for new structure the creep will be more than the old structure i.e. the creep rate decreases with time.
Answer:
b. The pirating streams are eroding headwardly to intersect more of the other streams’ drainage basins, causing water to be diverted down their steeper gradients.
Explanation:
From the Kaaterskill NY 15 minute map (1906), this shows two classic examples of stream capture.
The Kaaterskill Creek flow down the east relatively steep slopes into the Hudson River Valley. While, the Gooseberry Creek is a low gradient stream flowing down the west direction which in turn drains the higher parts of the Catskills in this area.
However, there is Headward erosion of Kaaterskill Creek which resulted to the capture of part of the headwaters of Gooseberry Creek.
The evidence for this is the presence of "barbed" (enters at obtuse rather than acute angle) tributary which enters Kaaterskill Creek from South Lake which was once a part of the Gooseberry Creek drainage system.
It should be noted again, that there is drainage divide between the Gooseberry and Kaaterskill drainage systems (just to the left of the word Twilight) which is located in the center of the valley.
As it progresses, this divide will then move westward as Kaaterskill captures more and more of the Gooseberry system.
Answer:
E= 15 GPa.
Explanation:
Given that
Length ,L = 0.5 m
Tensile stress ,σ = 10.2 MPa
Elongation ,ΔL = 0.34 mm
lets take young modulus = E
We know that strain ε given as



We know that

Therefore the young's modulus will be 15 GPa.
Answer: l = 2142.8575 ft
v = 193.99 ft/min.
Explanation:
Given data:
Thickness of the slab = 3in
Length of the slab = 15ft
Width of the slab = 10in
Speed of the slab = 40ft/min
Solution:
a. After three phase
three phase = (0.2)(0.2)(0.2)(3.0)
= 0.024in.
wf = (1.03)(1.03)(1.03)(10.0)
= 10.927 in.
Using constant volume formula
= (3.0)(10.0)(15 x 15) = (0.024)(10.927)Lf
Lf = (3.0)(10.0)(15 x 15)/(0.024)(10.927)
= 6750 /0.2625
= 25714.28in = 2142.8575 ft
b.
vf = (0.2 x 0.2 x 3.0)(1.03 x 1.03 x 10.0)(40)/(0.024)(10.927)
= (0.12)(424.36)/0.2625
= 50.9232/0.2625
= 193.99 ft/min.