The work done is 400 J
Explanation:
The work done by you in pushing the box along the slope is given by

where
F is the magnitude of the force applied
d is the distance covered by the box along the slope
Here we have the following:
F = 200 N is the magnitude of the force applied
is the distance covered, where
h = 1 m is the vertical rise
is the slope of the plane
Substituting and solving, we find

Learn more about work:
brainly.com/question/6763771
brainly.com/question/6443626
#LearnwithBrainly
The distance traveled by the wood after the bullet emerges is 0.16 m.
The given parameters;
- <em>mass of the bullet, m = 23 g = 0.023 g</em>
- <em>speed of the bullet, u = 230 m/s</em>
- <em>mass of the wood, m = 2 kg</em>
- <em>final speed of the bullet, v = 170 m/s</em>
- <em>coefficient of friction, μ = 0.15</em>
The final velocity of the wood after the bullet hits is calculated as follows;

The acceleration of the wood is calculated as follows;

The distance traveled by the wood after the bullet emerges is calculated as follows;

Thus, the distance traveled by the wood after the bullet emerges is 0.16 m.
Learn more here:brainly.com/question/15244782
He used truffula trees to make thneeds
Answer:
The answer is 0.5 Hz
Explanation:
Its pretty easy to get the answer. One hertz (Hz) is equal to one cycle or period per second. So, just divide the period by the number of seconds.
1 period/2 secs = 1/2 Hz or 0.5 Hz