-5x-10=10 x= -4
Work:
-5x-10=10
+10 +10
______________
-5x=20
_______
-5 -5
x=-4
Answer:
Step-by-step explanation:
Using the area model and standard algorithm, we have:
332 (tenths)
<u> × 21 </u>
332
<u> 664 </u>
<u> 6972 </u> tenths = 697.2
<u />
30 + 3 tenths
1 300 32 332
20 600 64 664
33.2 × 21 =<u> 30 </u> × <u> 1 </u> = <u> 30 </u>
35% packed their lunch. 65/100 bought hot lunch. 100-65=35.
Answer:
.
Step-by-step explanation:
Answer:
Step-by-step explanation:
If Kyle can get 5/8 of a shed built in x amount of time, he can get 62.5% done; if Jack can get 1/5 of the shed built in the same time, he can 20% of it done. As a ratio:
Kyle gets the whole thing done, 100% of the way, leaving Jack lagging behind at a somewhat lower percentage of the work being done.
and cross multiply to solve for the percentage of the shed built by Jack by the time Kyle gets it completed:
62.5x = 2000 so
x = 32%