1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
topjm [15]
3 years ago
5

Generally the primary source of all water supply is to be said as

Engineering
2 answers:
ludmilkaskok [199]3 years ago
6 0

Answer:

its a river

Explanation:

rivers have running wter

geniusboy [140]3 years ago
3 0

Answer:

b) River

the primary source of all water supply is to be said as River

Explanation:

You might be interested in
Lets Try This: study the pictures. Describe what you see and think about it. write your answer on a sheet of paper. home room
Yuliya22 [10]

Answer: I see three children cleaning the lawn while one of them are raking the leaves and one is holding a dust pan. The other child is holding a bucket. On the other picture, i see a young boy watering plants.

BTW: these pictures are not very clear so answers may vary.

Explanation:

4 0
2 years ago
Why is tubing sometimes coiled when installed in a car or vechile
andriy [413]

Answer:

Coiled tubing is often used to carry out operations similar to wire lining.

8 0
2 years ago
PLEASE HELP QUICK!!
ivolga24 [154]

R01= 14.1 Ω

R02=  0.03525Ω

<h3>Calculations and Parameters</h3>

Given:

K= E2/E1 = 120/2400

= 0.5

R1= 0.1 Ω, X1= 0.22Ω

R2= 0.035Ω, X2= 0.012Ω

The equivalence resistance as referred to both primary and secondary,

R01= R1 + R2

= R1 + R2/K2

= 0.1 + (0.035/9(0.05)^2)

= 14.1 Ω

R02= R2 + R1

=R2 + K^2.R1

= 0.035 + (0.05)^2 * 0.1

= 0.03525Ω

Read more about resistance here:

brainly.com/question/17563681

#SPJ1

5 0
1 year ago
A number 12 copper wire has a diameter of 2.053 mm. Calculate the resistance of a 37.0 m long piece of such wire.
Alinara [238K]

Answer:

R=1923Ω

Explanation:

Resistivity(R) of copper wire at 20 degrees Celsius is 1.72x10^-8Ωm.

Coil length(L) of the wire=37.0m

Cross-sectional area of the conductor or wire (A) = πr^2

A= π * (2.053/1000)/2=3.31*10^-6

To calculate for the resistance (R):

R=ρ*L/A

R=(1.72*10^8)*(37.0)/(3.31*10^-6)

R=1922.65Ω

Approximately, R=1923Ω

5 0
2 years ago
Three tool materials (high-speed steel, cemented carbide, and ceramic) are to be compared for the same turning operation on a ba
Tpy6a [65]

Answer:

Among all three tools, the ceramic tool is taking the least time for the production of a batch, however, machining from the HSS tool is taking the highest time.

Explanation:

The optimum cutting speed for the minimum cost

V_{opt}= \frac{C}{\left[\left(T_c+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]^n}\;\cdots(i)

Where,

C,n = Taylor equation parameters

T_h =Tool changing time in minutes

C_e=Cost per grinding per edge

C_m= Machine and operator cost per minute

On comparing with the Taylor equation VT^n=C,

Tool life,

T= \left[ \left(T_t+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]}\;\cdots(ii)

Given that,  

Cost of operator and machine time=\$40/hr=\$0.667/min

Batch setting time = 2 hr

Part handling time: T_h=2.5 min

Part diameter: D=73 mm =73\times 10^{-3} m

Part length: l=250 mm=250\times 10^{-3} m

Feed: f=0.30 mm/rev= 0.3\times 10^{-3} m/rev

Depth of cut: d=3.5 mm

For the HSS tool:

Tool cost is $20 and it can be ground and reground 15 times and the grinding= $2/grind.

So, C_e= \$20/15+2=\$3.33/edge

Tool changing time, T_t=3 min.

C= 80 m/min

n=0.130

(a) From equation (i), cutting speed for the minimum cost:

V_{opt}= \frac {80}{\left[ \left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]^{0.13}}

\Rightarrow 47.7 m/min

(b) From equation (ii), the tool life,

T=\left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]}

\Rightarrow T=53.4 min

(c) Cycle time: T_c=T_h+T_m+\frac{T_t}{n_p}

where,

T_m= Machining time for one part

n_p= Number of pieces cut in one tool life

T_m= \frac{l}{fN} min, where N=\frac{V_{opt}}{\pi D} is the rpm of the spindle.

\Rightarrow T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 47.7}=4.01 min/pc

So, the number of parts produced in one tool life

n_p=\frac {T}{T_m}

\Rightarrow n_p=\frac {53.4}{4.01}=13.3

Round it to the lower integer

\Rightarrow n_p=13

So, the cycle time

T_c=2.5+4.01+\frac{3}{13}=6.74 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times6.74+\frac{3.33}{13}=\$4.75/pc

(e) Total time to complete the batch= Sum of setup time and production time for one batch

=2\times60+ {50\times 6.74}{50}=457 min=7.62 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times4.01}{457}=0.4387=43.87\%

Now, for the cemented carbide tool:

Cost per edge,

C_e= \$8/6=\$1.33/edge

Tool changing time, T_t=1min

C= 650 m/min

n=0.30

(a) Cutting speed for the minimum cost:

V_{opt}= \frac {650}{\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]^{0.3}}=363m/min [from(i)]

(b) Tool life,

T=\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]=7min [from(ii)]

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 363}=0.53min/pc

n_p=\frac {7}{0.53}=13.2

\Rightarrow n_p=13 [ nearest lower integer]

So, the cycle time

T_c=2.5+0.53+\frac{1}{13}=3.11 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times3.11+\frac{1.33}{13}=\$2.18/pc

(e) Total time to complete the batch=2\times60+ {50\times 3.11}{50}=275.5 min=4.59 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.53}{275.5}=0.0962=9.62\%

Similarly, for the ceramic tool:

C_e= \$10/6=\$1.67/edge

T_t-1min

C= 3500 m/min

n=0.6

(a) Cutting speed:

V_{opt}= \frac {3500}{\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]^{0.6}}

\Rightarrow V_{opt}=2105 m/min

(b) Tool life,

T=\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]=2.33 min

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 2105}=0.091 min/pc

n_p=\frac {2.33}{0.091}=25.6

\Rightarrow n_p=25 pc/tool\; life

So,

T_c=2.5+0.091+\frac{1}{25}=2.63 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times2.63+\frac{1.67}{25}=$1.82/pc

(e) Total time to complete the batch

=2\times60+ {50\times 2.63}=251.5 min=4.19 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.091}{251.5}=0.0181=1.81\%

3 0
3 years ago
Other questions:
  • (3) In the following power system, the transformer is assumed to be ideal. Determine the: a) currents and voltages across each i
    9·1 answer
  • What Degree Do You Need To Become a Solar Engineer?<br> (2 or more sentences please)
    13·1 answer
  • 1. How many types of pumps are present?​
    14·1 answer
  • A driver on a leveltwo-lane highway observes a
    6·1 answer
  • The acceleration of a point is given. a = 20 t m/s2 When t=0, s = 50 m and v = -8 m/s. What are the position and velocity of the
    13·1 answer
  • You need to bake 2 dozen chocolate chip
    12·1 answer
  • Give six reasons why farmers cultivate on small land​
    5·1 answer
  • Expert Review is done by end users.
    9·1 answer
  • What car has autopilot?
    14·2 answers
  • 9. What power tool incorporates a set of dies and punches to cut new
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!