The advantage of a pareto chart is to make sure they have all of their tools
Answer:
Technician B
Explanation:
Technician B is correct in his argument. This is because according to what he said, as the computer pulses stimuli the coil will turn on and off, promoting an increase in the voltage that will cause the fluctuation. Technician A is incorrect because the procedure he indicated imposes that the voltage is checked at the negative terminal and not at the positive.
Answer:
first one, rest are okay ig.....
Explanation:
Answer:
A)The sketches for the required planes were drawn in the first attachment.
B)The sketches for the required directions were drawn in the second attachment.
To draw a plane in a simple cubic lattice, you have to follow these instructions:
1- the cube has 3 main directions called "a", "b" and "c" (as shown in the first attachment)
2- The coordinates of that plane are written as: π:(1/a₀ 1/b₀ 1/c₀) (if one of the coordinates is 0, for example (1 1 0), c₀ is ∞, therefore that plane never cross the direction c).
3- Identify the points a₀, b₀, and c₀ at the plane that crosses this main directions and point them in the cubic cell.
4- Join the points.
To draw a direction in a simple cubic lattice, you have to follow these instructions:
1- Identify the points a₀, b₀, and c₀ in the cubic cell.
2- Draw the direction as a vector-like (a₀ b₀ c₀).
Answer:
In the passage, it has been mentioned that the president of CFR received the letter from GET, who offered them to install the network servers at the cost of $5 million and the president of CFR also accept it. Although the GET will charge 50 percent more charges after getting the news of heavy tax on technology providers, I will not accept it. As a president of CFR my argument will be that I will ask them (GET) to install the servers at the earlier price that the GET offers before heavy taxation, otherwise, I will reject the offer as I had not formally agreed. Because, the president already informed them about the acceptance of the offer.
My other argument will be that if the GET will not accept my previous proposal, I will go to another technology provider, who can offer the service at a lower cost in comparison to the GET.