Answer:
let me check the answer for you
Answer:
option B
Explanation:
given,
height of building = 0.1 km
ball strikes horizontally to ground at = 65 m
speed at which the ball strike = ?
vertical velocity = 0 m/s
time at which the ball strike



t = 4.53 s
vertical velocity at the time 4.53 s = g × t = 9.8 × 4.53 = 44.39 m/s
horizontal velocity =
=14.35 m/s
speed of the ball =
= 46.65 m/s
hence, the speed of the ball just before it strike the ground = 47 m/s
The correct answer is option B
It's the angle made by the incident ray when it's perpendicular to the surface. (Perpendicular lines are the lines that form a graph or like a 90-degree angle)
Answer:
a.
b.1058 N
Explanation:
We are given that
Mass of each dog,M=18.5 kg
Mass of sled with rider,m=250 kg
a.Average force,F=185 N


By Newton's second law



b.By Newton's second law

Substitute the values

Hence, the force in the coupling between the dogs and the sled=1058 N
Work is force times distance. If there's no distance, there's no work being done.