1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zolol [24]
3 years ago
12

Given RS = 6, ST = 3, and SL = 4, find QT.

Mathematics
2 answers:
oksano4ka [1.4K]3 years ago
8 0

Hey there!!

The given diagram would be a cuboid.

Given that RS = 6.

RS = length

And with this, we will also know that QT is the length.

And all the length are the same.

Hence,

RS = QT

<u><em>Hence, the measure of QT is 6 </em></u>

<u><em>Hope it helps!</em></u>

Sati [7]3 years ago
6 0

QT is a parallel line to RS

The image is a 3D cube, so QT would be the same as RS

QT = 6

You might be interested in
Pls help. I'm stuck on this question
Sav [38]
547.66666666666666667
7 0
3 years ago
In a box there are three types of chocolate. there are 6 plain chocolate 8 milk chocolate and 10 white chocolate. Deon takes 2 c
olchik [2.2K]

Step-by-step explanation:

  • 1 plain chocolate and 1milk chocolate
  • 1 plain chocolate and 1 white chocolate
  • 1 milk chocolate and 1 white chocolate
<h3>we have to it like that only right??</h3>
8 0
3 years ago
Charlie’s portfolio has an expected annual return at 10%, with an annual standard deviation at 12%. Assume his investment return
Deffense [45]

Answer:

There is a 34.13% probability that the actual return will be between the mean and one standard deviation above the mean.

Step-by-step explanation:

This is problem is solving using the Z-score table.

The Z-score of a measure measures how many standard deviations above/below the mean is a measure. Each Z-score has a pvalue, that represents the percentile of a measure.

What is the probability that the actual return will be between the mean and one standard deviation above the mean?

One measure above the mean is Z = 1

The mean is Z = 0

This means that this probability is the pvalue of Z = 1 subtracted by the pvalue of Z = 0.

Z = 1 has a pvalue of 0.8413.

Z = 0 has a pvalue of 0.50.

This means that there is a 0.8413-0.50 = 0.3413 = 34.13% probability that the actual return will be between the mean and one standard deviation above the mean.

3 0
3 years ago
Solve 9 = 4 + x ( show your work )
Tanya [424]

Answer:

x = 5

Step-by-step explanation:

1. 9 = 4 + x

2. 9 - 4 = 4 + x - 4

3. 5 = x

4 0
3 years ago
HELP WITH POLYGONS SOON AS POSSIBLE During an expedition, archeologists find four objects at the positions labeled E, F, G, and
Evgen [1.6K]
It would be : B. 8 units
5 0
3 years ago
Other questions:
  • Heyo! I need help with the picture below! Thanks!
    7·1 answer
  • If 12 roses cost $18.96 what does 5 roses cost
    10·1 answer
  • A right triangle has a hypotenuse of length 20 and a leg of length 12. what is the length of the other leg? if necessary, round
    7·1 answer
  • Choose the pair of events that is mutually exclusive. (a). Even integers and multiples of 3 (b). Odd integers and multiples of 4
    6·2 answers
  • If i have 45 pen is ;) and 90 coins how much is that total
    7·1 answer
  • Machine A and machine B both make car parts.
    9·2 answers
  • What is the side length a in the triangle below?
    14·1 answer
  • Which of the following is a geometric sequence? Help pleaseee!
    6·2 answers
  • 460x23 in detail steps plase
    6·2 answers
  • What is the base (in inches) of a triangle with an area of 161 square inches and a height of 14 inches?
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!