Power output = V*I=11000*750=8250 kVA= 8250 kW
Answer:
The answer is time
Explanation:
So when youre given force and distance, you can determine work done
Work Done = Force × Distance travelled in the
direction of the force
Since Power = Work Done/ Time
when you know work done, and you want to find power, you will need time.
Because you have work done already, you dont need energy. Though you can use energy and time to find work too. The alternative formula for Power would be:
Power = Energy Converted/Time
The first step of the scientific method is to MAKE OBSERVATIONS
Answer:
Average velocity, V = 2.5m/s
Explanation:
Given the following data
Displacement = 10m
Time = 4secs
Average velocity can be defined as the rate of change in displacement with time. Velocity is a vector quantity and as such it has both magnitude and direction.
Mathematically, average velocity is given by the equation;


Substituting into the above equation;

Average velocity, V = 2.5m/s
Efficiency = Power Output / Power Input
Power Input = Rate of Energy input = 44.4 MJ/kg * 5 kg/h
= 222 MJ/h
But 1 hour = 3600seconds
222 MJ/h = 222 MJ/3600s = 0.061667 MW J/s = Watts
Power input = 0.061667 MW = 61 667 W
From Efficiency = Power Output / Power Input
28% = Power Output / 61667
Power Output = 0.28 * 61667
Power Output = 17266.76 W
Power Output ≈ 17 267 W
Rate of heat rejection = Power Input - Power Output
= 61667 - 17267 = 44400 W
Rate of heat rejection = 44 400W.