Answer:
cross-weight is used to tighten it up.
Explanation:
and yes this is important because Cross-weight percentage compares the diagonal weight totals to the car's total weight.
hope this help
(mark this answer as an brainliest answer)
Answer:
1791 secs ≈ 29.85 minutes
Explanation:
( Initial temperature of slab ) T1 = 300° C
temperature of water ( Ts ) = 25°C
T2 ( final temp of slab ) = 50°C
distance between slab and water jet = 25 mm
<u>Determine how long it will take to reach T2</u>
First calculate the thermal diffusivity
∝ = 50 / ( 7800 * 480 ) = 1.34 * 10^-5 m^2/s
<u>next express Temp as a function of time </u>
T( 25 mm , t ) = 50°C
next calculate the time required for the slab to reach 50°C at a distance of 25mm
attached below is the remaining part of the detailed solution
The total number of trips that the vehicle has to make based on the given sequence of operation is 120 trips.
<em>"Your</em><em> </em><em>question is not complete, it seems to be missing the following information;"</em>
The sequence of operation is A - E - D - C - B - A - F
The given parameters;
- <em>number of pieces that will flow from the first machine A to machine F, = 2,000 pieces</em>
- <em>initial unit load specified in the first machine, L₁ = 50</em>
- <em>final unit load, L₂ = 100 </em>
- <em>the capacity of the vehicle = 1 unit load</em>
<em />
The given sequence of operation of the vehicle;
A - E - D - C - B - A - F
<em>the vehicle makes </em><em>6 trips</em><em> for </em><em>100</em><em> unit </em><em>loads</em>
The total number of trips that the vehicle has to make, in order to transport the 2000 pieces of the load given, is calculated as follows.
100 unit loads ----------------- 6 trips
2000 unit loads --------------- ?

Thus, the total number of trips that the vehicle has to make based on the given sequence of operation is 120 trips.
Learn more here:brainly.com/question/21468592
Answer:
Explanation:
The pictures below shows the whole explanation for the problem