1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
DENIUS [597]
3 years ago
11

Design a lead compensator for the closed-loop (CL) system whose open loop transfer function is given below. Design objectives: r

educe the time constant by 50% while increase the damping ratio to sqrt(3)/2 for the dominant poles. Please note that H(s)

Engineering
1 answer:
Montano1993 [528]3 years ago
5 0

Answer:

see attached bellow

Explanation:

You might be interested in
Based on the ELR, the stability classification of the atmosphere at the airport between the surface and 3000 m is
Anna11 [10]

Answer:

The answer is "conditionally unstable"

Explanation:

The conditional volatility is really a condition of uncertainty, which reflects on whether increasing air is polluted or not. It determines the rate of ambient delay, which has been between humid and dry adiabatic rates. In general, the environment is in an unilaterally unhealthy region.

Classification dependent on ELR:

Larger than 10 \frac{^{\circ}C}{1000} m Around 10 and 6 \frac{^{\circ}C}{1000} m or less 6 \frac{^{\circ}C}{1000} m volatile implicitly unreliable Therefore ELR is implicitly unreliable 9 \frac{^{\circ}C}{1000} m, that's why it is "conditionally unstable".

6 0
4 years ago
Complete the following sentence. The skills and content of several subject areas were combined to form a new field known as a me
Svetlanka [38]

Answer:

The answer is "discipline" , I was doing the same thing a minute ago. I hope this anwser is helpful! ^^

Explanation:

5 0
3 years ago
Read 2 more answers
How are the fuel gas and oxygen cylinders fastened to the cutting outfit or portable truck​
ivolga24 [154]
In an upright position with a chain, I hope that helps!
6 0
3 years ago
Under a construction management (CM) contract, should the CM firm's responsibilities normally begin at the construction phase, t
Yuki888 [10]

Answer:

Conceptual or planning design phase.

Explanation:

Construction management have following phases

Phase 1 :Conceptual or planning design phase.

Phase 2 : Engineering and design phase.

Phase 3 :Procurement phase.

Phase 4 :Execution phase.

Phase 5 :Operation and maintenance phase.

These all phases running in a proper sequence .So at the begging of construction the first phase is conceptual or planning phase.

7 0
3 years ago
What is the correct answer A, B, C, D
Georgia [21]

Answer:

B a lever because it can move up and down

Explanation:

8 0
3 years ago
Other questions:
  • Explain what entropy is in relation to the second law of thermodynamics?
    9·1 answer
  • How to build a laser pointer?
    12·1 answer
  • A. The temperature of a system is measured to be 75 °F. Express this temperature in °C, K, and R.
    9·1 answer
  • A piece of corroded metal alloy plate was found in a submerged ocean vessel. It was estimated that the original area of the plat
    8·1 answer
  • Thoughts about drinking and driving
    12·2 answers
  • When could you use the engineering design process in your own life?
    9·1 answer
  • Best known for his invention of the pressure-ignited heat engine that bears his name,
    5·1 answer
  • The MAP sensor's vacuum hose is loose and cracking. Technician A says this sensor measures air mass to establish the fuel inject
    14·1 answer
  • What is the definition of a sheet metal tab?
    10·2 answers
  • How many volts of alternating current passes through the electrolytic capacitor
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!