Answer:
c) site preparation
Explanation:
A construction process can be defined as a series of important physical events (processes) that must be accomplished during the execution of a construction project.
Generally, in the construction of any physical asset such as offices, hospitals, schools, stadiums etc, the first step of the construction process is site preparation. Site preparation refers to processes such as clearing, blasting, levelling, landfilling, surveying, cutting, excavating and demolition of all unwanted objects on a piece of land, so as to make it ready for use.
This ultimately implies that, site preparation should be the first task to be accomplished in the construction process.
Hence, the construction process typically begins with site preparation before other activities such as the laying of foundation can be done.
Additionally, construction costs can be defined as the overall costs associated with the development of a built asset, project or property. The construction costs is classified into two (2) main categories and these are; capital and operational costs.
Answer
For isotropic material plastic yielding depends upon magnitude of the principle stress not on the direction.
Tresca and Von Mises yield criteria are the yield model which is widely used.
The Tresca yield criterion stated that yielding will occur in a material only when the greatest maximum shear stress reaches a critical value.
max{|σ₁ - σ₂|,|σ₂ - σ₃|,|σ₃ - σ₁|} = σ_f
under plane stress condition
|σ₁ - σ₂| = σ_f
The Von mises yielding criteria stated that the yielding will occur when elastic energy of distortion reaches critical value.
σ₁² - σ₁ σ₂ + σ₂² = σ²_f
Answer:
2ib
Explanation:
if you divide 10 divided by 2 it gives you 5 and then subtract it by 2.2 = 2.8
there goes your answer.