1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
andrezito [222]
3 years ago
9

Point c is located in which quadrant?​

Mathematics
2 answers:
Murrr4er [49]3 years ago
7 0

Answer 4

Step-by-step explanation:

Top right 1

Top left 2

Bottom left 3

bottom right 4

vlada-n [284]3 years ago
4 0

Answer:

IV.

Step-by-step explanation:

You need to know that for the x-axis, right means positive values and left means negative values. In this case, C is on the right side of the x-axis, then has a positive x value.

For the y-axis up means positive values and down means negative values. In this case, C is down, so C has a negative y-value.

Now,

I quadrant is x and y positive.

II quadrant is x negative and y positive.

III quadrant is x and y negative.

IV quadrant is x positive and y negative.

Then as C has x positive and y negative, C is in IV quadrant.

You might be interested in
3. A company makes a profit of $60 per software program and $45 per video game. The company can produce at most 300 software pro
andreev551 [17]

Answer:

Step-by-step explanation:

This problem is a maximization problem

the objective is to maximize profit

let software program be x

and video program be y

the objective function is

60x+45y>P-------1

constrains

300x+200y<400------2

we can further reduce the expressions

3x+2y<4-----2

5 0
4 years ago
What is the value of r, the part of the job that Marina can complete in 1 hour? 0.1 0.4 0.5 0.6
kvv77 [185]
So, Katherine can do 0.1 of the job per hour. (if she needs 10 hours for the job, each hour she can do the whole divided by the time, so 1/10, which is 0.1)

if in two hours she and Marina can be done, then Marina will do 1(the whole job)-2/10 (twice as much as she can do in an hour)=0.8 of the job. So if Marina does 0.8 of the job in two hours, each hour she will do half of it: 0.4 - and this is the correct answer 
4 0
3 years ago
Read 2 more answers
What is 61% of 524? <br> Thanks
Vanyuwa [196]
319.64 i think hope this helps
3 0
3 years ago
Read 2 more answers
What is the answer to the problem (m-3)(-10)
OverLord2011 [107]

The answer is -10m + 30




8 0
3 years ago
Need help asap with this problem.
4vir4ik [10]

Answer:

53°

Step-by-step explanation:

I color coordinated the angles in this picture. The angles with the same color are the same angle.

Please let me know if you don't understand--I would love to help more!

5 0
3 years ago
Other questions:
  • Exercise 5.6.6: Selecting a committee of senators. About A country has two political parties, the Demonstrators and the Repudiat
    8·1 answer
  • Write 5 1/4% as a simple fraction.
    6·1 answer
  • Q(a+y)=67y+93 Solve for y
    10·2 answers
  • A city pool sells full-day and half-day passes during the summer. The goal is to make $1000 each day from pool pass sales. The g
    13·1 answer
  • (-(-2)4), (minus(minus two)power four)=
    13·1 answer
  • Use the synthetic division shown to help factor the polynomial and solve the equation.
    9·2 answers
  • 5. How do natural numbers differ from whole numbers?​
    13·1 answer
  • When there are 16 sharks, there are 13 jets. if there are 26 jets, how many sharks are there
    8·2 answers
  • Cost of a shirt: $14.95<br> Markup: 25%<br> Discount: 45%
    5·1 answer
  • Given: Triangle ABC, mmBC=24 cm, line segment AL- &lt; bisector
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!