True I think I’m not sure?
The answer is choice C
Explanation:
As during construction ,the site is cleared for all debris before laying out the foundation. Even the sewer lines are dug out .
So it will be useful for the construction crews to connect the pipes to the sewer lines before the foundation is poured.
But usually the steps take in construction activity is:- first the site is cleared for the foundation to be poured and once the foundation wall is set , then all utilities , including plumbing and electrical activities are done.,
After this process is over, the city inspector comes to check whether the foundation has been laid down as per the code of construction.
Only after that the rest of the construction activity follows through.
Answer:
Larson, an economist, who placed the total value of $23 trillion for the entire 1.9 billion acres of land in the United States. This means that the average cost for an acre of land is $12,000 or $60,000 for 5 acres of land. Almost half of the land in the US is used for agricultural purposes.
Explanation:
Answer:
building lol and actually workin
Explanation:
Answer:
(a) The force sustained by the matrix phase is 1802.35 N
(b) The modulus of elasticity of the composite material in the longitudinal direction Ed is 53.7 GPa
(c) The moduli of elasticity for the fiber and matrix phases is 124.8 GPa and 2.2 GPa respectively
Explanation:
Find attachment for explanation