Answer:
Sense the current leakage
Trip the circuit
Cut off the electricity
Explanation:
The correct order is -
Sense the current leakage
Trip the circuit
Cut off the electricity
Reason -
First step has to be taken to sense the electric current leakage without it being detected, it cant be dealt with.
The second step consists of tripping the circuit so at to remove the flow of electricity.
The third step is to Cut the electricity off so to stop the leakage and be safe.
Answer:
Letter D
Explanation:
AutoCAD provides eleven different ways to create arcs. The different options are used based on the geometry conditions of the design. To create an arc, you can specify various combinations of center, endpoint, start point, radius, angle, chord length, and direction values.
Answer:
Combination circuit; The basic strategy for the analysis of combination circuits involves using the meaning of equivalent resistance for parallel branches to transform the combination circuit into a series circuit.
Example:
The use of both series and parallel connections within the same circuit. In this case, light bulbs A and B are connected by parallel connections and light bulbs C and D are connected by series connections. This is an example of a combination circuit.
Answer:
Welding, carpentry, masonry, construction worker, barber
Explanation: