There are several information's of immense importance that are already given in the question. Based on those information's the answer to the question can be very easily determined.
Initial velocity of the object (V1) = 65 m/s
Final velocity of the object (V2) = 98 m/s
Time taken by the object = 12 seconds
Then
Acceleration of the object = (V2 - V1)/Time taken
= (98 - 65)/12 m/s^2
= 33/12 m/s^2
= 2 9/12 m/s^2
= 2.75 m/s^2
So the acceleration of the object can be written as 2 9/12 meter per square second or 2.75 meter per square second.
Answer:
At 11 AM, the train is a constant speed of 110 km/h. when the truck is 160 ahead. When they meet, it will be 2 PM
Explanation:
At the train's first hour he moved to 110 km. The truck is at 160 km. The second hour includes train at 220 km, with truck at 240. At 2 PM, they are at the same place.
Answer:
Either energy transformation or energy conversion
Depends on which one you were taught.
Like bad energy
Scientific energy
Um thats all i got sry
Answer:
Work done, W = 6 J
Explanation:
It is given that,
Force of gravity acting on the book, weight of the book is 15 N
We need to find the work done in lifting the book straight up for a distance of 0.4 meters.
The weight of the book is acting in downward direction and the book is lifted straight up, it means angle between them is 180 degrees. Work done is given by :
So, the magnitude of work done in lifting the book is 6 joules.