1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
liubo4ka [24]
3 years ago
8

This is a point at which a graph intersects the y-axis. Example: (0, 5) for the equation y = x + 5.

Mathematics
1 answer:
faltersainse [42]3 years ago
3 0
The point where a graph intersects the y-axis is called the y-intercept.

Hope this helps!
Your fortune is "You will find something that you have lost before."
You might be interested in
If anyone could help that would be great<br> And shoe the work plz thanks
oksano4ka [1.4K]

1/2, 3/5, 3/4, 7/8 is the answer

8 0
3 years ago
What is the measure of the angle to the nearest degree? Enter the answer in the box.<br> degrees
Temka [501]

Answer:

52.814 degrees

Step-by-step explanation:

we know that

we have

Convert 51'' to minutes

Convert 48.85' to degrees

6 0
3 years ago
Helppp it’s due today!!
Temka [501]

Answer: 15 + c = 64

Step-by-step explanation:

we need to do 15 + 64

C represents her age, which would be 49, if you needed to know

Therefore the equation is 15 + c

6 0
3 years ago
Nvmnjnjknkjnknjobkjbkbkbkbkjbkjb
oksian1 [2.3K]
I think you are right since 2 plus 2 equals 4
3 0
3 years ago
A manufacturer produces both two-slice and four-slice toasters. The two-slice toaster takes 6 hours of labor to produce and the
frosja888 [35]

We have two products: a two-slice toaster and a four-slice toaster.

Lets call T the number of two-slice toasters produced and F the number of four-slice toasters produced.

If we have 300 hours per week of labor, the sum of the labor required for T and F has to be lower or equal to that value.

The labor hours that take to make the two-slice toasters can be written as 6*T, as it is the product of the hours per unit (6 hours/unit) by the number of units (T units).

The same can be done for F, where the labor required can be expressed as 10*T.

If we add these terms, and make them be less or equal than 300, we get:

6T+10F\le300

The production capacity is 40 units, so the sum of T and F has to be less or equal than 40.

We can express this as:

T+F\le40

Answer:

The system of inequalities for this problem becomes:

\begin{gathered} 6T+10F\le300 \\ T+F\le40 \end{gathered}

6T+10F<=300

T+F<=40

6 0
1 year ago
Other questions:
  • The sum of one-third of a number and 5 is 27.<br> I need help plz!!
    15·2 answers
  • Determine which relation is a function.
    10·1 answer
  • Determine if the parallelograms are similar. If so write a similarity statement. Be sure to fill in all the blanks.
    6·1 answer
  • Five hundred students were asked to identify their favorite electronic device. The results are shown in the circle graph. If 25,
    8·1 answer
  • (-18)+1+13+(-15)= ?​
    11·1 answer
  • The drama club ordered shirts to raise money for a field trip. The club purchased the shirts at $5 each and wants to make an 80%
    8·1 answer
  • A rectangular block has a volume of 300 in. A cone-shaped portion has been removed. The diameter of the cone is 4 inches.
    8·1 answer
  • Need answered ASAP!
    12·1 answer
  • Solve the inequality 9-12&gt;-13<br> A. q&gt;1<br> B. q&gt;-1<br> C. q&gt;25<br> D. q&gt;-25
    13·1 answer
  • What type of polynomial is: 3x^4 - 2x^3 - 2
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!