Answer:
Bike Frame Flow Time
The value-added percentage of the flow time for this bike frame is:
= 46.
Explanation:
a) Data and Calculations:
Bike Frame Flow Time:
Setup time = 7 hours
Processing time = 6 hours
Storage time = 7 hours
Flow time of the bike frame = 13 hours (7 + 6)
Value-added percentage of the flow time for this bike frame = 6/13 * 100
= 46%
b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end. It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path. The storage time is not included in the flow time since it is not a manufacturing process.
Answer:
Networks prevent unauthorized access to data and protect equipment. Networked computers are less likely than single computers to suffer equipment failure. Networks allow computers to connect quickly and to share data or equipment.
Explanation:
Access hundreds of professional development resources for museum professionals. Museum professionals can benefit at any career stage from student to retiree. Student Membership. Industry Membership. Established Since 1906. Museum Memebership. 501(c)3 Nonprofit Org.
In the RGB (Red, Green, Blue) color model, the numbers 0-255 represent the intensities of each color beam
.Each number represents an intensity value is on a scale of 0 to 255, It can be also written in hexadecimal form, from 00 to FF.
RGB values are encoded as 8-bit integers, which range from 0 to 255.