3 years ago
8

Two technicians are discussing how to loosen bleeder valves. Technician A says that a shock is usually necessary to break the ta

per at the base of the valve. Technician B says to apply steady, loosening torque to the bleeder valve using a 6-point wrench. Which technician is correct
Engineering
1 answer:
DENIUS [597]3 years ago
3 0

Answer:

Technician A only

Explanation:

In order to loosen a bleeder valve, the following steps can be used

Step 1; Break the taper at the bleeder valve base and the corrosion or rusts present on the threads by tapping on the bleeder valve end with a steel hammer

Step 2; Tap the bleeder valve with a 6-point socket or wrench in the clockwise or tightening direction

Step 3; Tap the bleeder valve with the same 6-point socket or wrench in the counterclockwise or loosening direction in order to loosen it

Step 4; Repeat the above steps until the bleeder valve is loose.

You might be interested in
Why will screws never replace nails​
cupoosta [38]

Answer:

because people have different opinions on nails and screws

Explanation:

3 0
4 years ago
O que é necessário se conhecer para a determinação de uma força concentrada em um ponto?
skelet666 [1.2K]

Answer: its c

Explanation:

7 0
3 years ago
Individual/organizations who are responsible for monitoring, verifying, and sometimes certifying various aspects of the construc
Rus_ich [418]

The project or the site manager is responsible for monitoring or verifying the aspects of the construction process.

The site or the project manager is the individual that is responsible for the adherence to quality and guidance on the construction site.

The site or project manager has the following tasks

  • ensuring safety on the site
  • Monitoring the progress or the work that is being done
  • Sourcing materials
  • Solving problems

In conclusion, the project manager monitors and verifies aspects of the construction process.

Read more on brainly.com/question/24887827?referrer=searchResults

8 0
3 years ago
7. Which of the following is a disadvantage of an electromagnet?
Sati [7]

Answer:

I think

electromagnets require power to operate

7 0
3 years ago
The modifications of superheat and reheat for a vapor power plant are specifically better for the operation which of the followi
MatroZZZ [7]

The modifications of superheating and reheat for a vapor power plant are specifically better for the operation which of the following components b.Boiler.

<h3>What are the primary additives in the vapour strength cycle?</h3>

There are 5 steam strength cycles: The Carnot cycle, the easy Rankine cycle, the Rankine superheat cycle, the Rankine reheat cycle and the regenerative cycle.

  1. Central to expertise the operation of steam propulsion is the primary steam cycle, a method wherein we generate steam in a boiler, increase the steam via a turbine to extract work, condense the steam into water, and sooner or later feed the water again to the boiler.
  2. Reheat now no longer best correctly decreased the penalty of the latent warmness of vaporization in steam discharged from the low-stress quit of the turbine cycle, however, it additionally advanced the first-rate of the steam on the low-stress quit of the mills via way of means of decreasing condensation and the formation of water droplets inside the turbine.

Read more about the Boiler:

brainly.com/question/17362931

#SPJ1

7 0
2 years ago
Other questions:
  • Who knows about welding ??
    7·1 answer
  • Using the celsius_to_kelvin function as a guide, create a new function, changing the name to kelvin_to_celsius, and modifying th
    5·1 answer
  • Write a matrix, that is a lower triangular matrix.
    15·1 answer
  • Π/4 = 1 - 1/3 + 1/5 - 1/7 + 1/9 ...
    5·1 answer
  • What are the equipment requirements for windshields and side windows?
    13·1 answer
  • What is the standard deviation of the following data set:
    7·1 answer
  • Can someone answer plz!! It’s 24 points
    15·2 answers
  • Anything you want to do in Hootsuite can be found in the ________, with the main workspace in the _________?
    15·1 answer
  • Re armature of a 4 pole DC generator is required to generate an emf of 520v on open circuit when revolving at a speed of 660rpm.
    9·1 answer
  • 6.48 programming project 1: encode/decode tic -tac-toe
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!