Answer:
Velocity.
Explanation:
Projectile motion is characterized as the motion that an object undergoes when it is thrown into the air and it is only exposed to acceleration due to gravity.
As per the question, 'any change in the initial velocity of the projectile(object having gravity as the only force) would lead to a change in the range as well as the maximum height of the projectile.' To illustrate numerically:
Horizontal range: As per expression:
R= (
*sin2θ)/g
the range depending on the square of the initial velocity.
Maximum height: As per expression:
H= (
*
θ
)/2g
the maximum distance also depends upon square of the initial velocity.
As the plane falls the parabolic path remains directly below as the plane continues to fly over. This give more of an overview. When the package falls vertical acceleration happens as there is a vertical velocity as the package falls form high above. The downwards motion of gravity acts on the package if the approximated projectile motion ignoring air resistance.
Answer:
trade winds
Explanation:
In tropics regions on the lower portion of earth's atmosphere the surface winds are observed in prevailing pattern. In northern hemisphere the trade wind predominantly blows from north east. In southern hemisphere it flows from south east. Subtropical high and the equator is in between these areas.
Thus, trade wind blow between the subtropical high and the equator.
Answer:
Explanation:
Given the equation modelled by the height of the train given as:
s(t) = 18t²-2t³ for for 0 ≤ t ≤ 9
a) Velocity is the rate of change of displacement.
Velocity = dS(t)/dt
V = dS(t)/dt = 36t - 6t² miles
Velocity at t = 3hrs is determiner by substituting t = 3 into the velocity function.
V = 36(3) -6(3)²
V= 108 - 72
Velocity = 36mi/hr
b) for Velocity at time = 7hrs
V(7) = 36(7) - 6(7)²
V(7) = 252 - 294
V(7) = -42mi/hr
The velocity at t = 7hrs is -42mi/hr
c) Acceleration is the rate of change of velocity.
a(t) = dV(t)/dt
Given v(t) = 36t - 6t²
a(t) = 36 - 12t
Acceleration at t=1 is given as:
a(1) = 36 -12(1)
a(1) = 24mi/hr²
Answer:
Explanation:
a) Power consumption is 4100 J/min / 60 s/min = 68.3 W(atts)
work done raised the potential energy
b) 75(9.8)(1000) / (3(3600)) = 68.055555... 68.1 W
c) efficiency is 68.1 / 68.3 = 0.99593... or nearly 100%
Not a very likely scenario.