GIVEN:
Amplitude, A = 0.1mm
Force, F =1 N
mass of motor, m = 120 kg
operating speed, N = 720 rpm
=
Formula Used:

Solution:
Let Stiffness be denoted by 'K' for each mounting, then for 4 mountings it is 4K
We know that:

so,
= 75.39 rad/s
Using the given formula:
Damping is negligible, so, 
will give the tranfer function
Therefore,
= 
= 
Required stiffness coefficient, K = 173009 N/m = 173.01 N/mm
Answer:
18.75in
Explanation:
Modulus of elasticity = Stress/Strain
Since stress = Force/Area
Given
Force = 1000lb
Area = 0.75sqin
Stress = 1000/0.75
Stress = 1333.33lbsqin
Strain
Strain = Stress/Modulus of elasticity
Strain = 1333.33/5,000,000
Strain = 0.0002667
Also
Strain = extension/original length
extension = 0.005in
Original length = extension/strain
Original length = 0.005/0.0002667
Original length = 18.75in
Hence the original length of the rectangular bar is 18.75in
Answer:
As we know that every molecule is attached by a strong force .The force required to disassemble the atoms is know as atomic binding force or we can say that the force required to disassemble the electron from atoms is known as binding force.On the other hand the energy require to doing this is known as atomic binding energy.
If the binding force is high then it will become difficult to disassemble thermally as well as mechanically.So we can say that it have direct relationship with materials strength and thermal stability.
Answer:
1) For preparation of plan :
It is to gather the team and creating the timeline. Gathering the inputs for the plan and confirming the mission and vision then launching the strategy.
2) A mission would describe about the company and the specification of the company
A vision is the long term or future state of the organization to achieve in a time frame.
Both would include the OAS statements and strategic shifts.
3) The OAS and strategic shift would help to create a balanced score card that would help for data gathering and analysis
This would include the financial, customers goal, Process goals, people's goals etc.
4) To create and develop the plan's framework:
To set the objective for high level organizational goals
To measure the and accomplish the objectives
To take initiatives to achieve the objectives
Explanation:
Answer:
Stat PVC = Stat(82+98.5)
Stat PVT = Stat(59+71.5)
Explanation
PVI = 71 + 35
Let G1 = Grade 1; G2 = Grade 2
G1 = +2.1% ; G2 = -3.4%
Highest point of curve at station = 74 + 10
General equation of a curve:

At highest point of the curve 


Station PVT