Answer:

Explanation:
Availability:
It define as the probability of system which perform desired task before showing any failure .
The availability can be define as follows

Or we can say that

Availability can also be express as

Where MTBF is the mean time between two failure.
MTTR is the mean time to repair.
Answer: Pi= 4 - 4/3 + 4/5 - 4/7 + 4/9 ...
Explanation:
Is the same as the example,
If Π/4 = 1 - 1/3 + 1/5 - 1/7 + 1/9 ...
Then
(Π/4 )*4= 4*(1 - 1/3 + 1/5 - 1/7 + 1/9 ...)
Π =4 - 4/3 + 4/5 - 4/7 + 4/9 ...
The way to write this is
Sum(from n=0 to n=inf) of (-1)^n 4/(2n+1)
(photo)
Answer and Explanation:
The coefficient of determination also called "goodness of fit" or R-squared(R²) is used in statistical measurements to understand the relationship between two variables such that changes in one variable affects the other. The level of relationship or the degree to which one affects the other is measured by 0 to 1 whereby 0 means no relationship at all and 1 means one totally affects the other while figures in between such 0.40 would mean one variable affects 40% of the other variable.
In making a decision as an engineer while using the coefficient of determination, one would try to understand the relationship between variables under consideration and make decisions based on figures obtained from calculating coefficient of determination. In other words when there is a 0 coefficient then there is no relationship between variables and an engineer would make his decisions with this in mind and vice versa.
Answer:
The time required is 10.078 hours or 605 min
Explanation:
The formula to apply here is ;
K=(d²-d²₀ )/t
where t is time in hours
d is grain diameter to be achieved after heating in mm
d₀ is the grain diameter before heating in mm
Given
d=5.5 × 10^-2 mm
d₀=2.4 × 10^-2 mm
t₁= 500 min = 500/60 =25/3 hrs
t₂=?
n=2.2
First find K
K=(d²-d²₀ )/t₁
K={ (5.1 × 10^-2 mm)²-(2.4 × 10−2 mm)² }/ 25/3
K=(0.051²-0.024²) ÷25/2
K=0.000243 mm²/h
Re-arrange equation for K ,to get the equation for d as;
d=√(d₀²+ Kt) where now t=t₂

The answer is B because it could be feasible but it’s not a need it and you got a time frame but it’s not a requirement and it doesn’t have to be unique.