X+4x-y5 is the wrong answer
4.92.
4 is a whole number, so it goes in the ones place
The ths means it is going to be a decimal, so 92 goes two right of the decimal point. Hope this helped
1) find the corresponding y values for when x = 0 and when x = 4,
when x = 0, y = 4
when x = 4, y = 4
the coordinates are (0,4) and (4,4)
2) to calculate the average rate of change, find the slope of the two points:
(0,4) (4,4)
(change in y) 4 - 4 = 0
(change in x) 4 - 0 = 4
0/4 = 0
the average rate of change is 0!
First we will find the interest on:
P = $235 principal
t = 2 years
r = 0.1415 annual rate
A = future value
I = A - P the interest
A = P(1 + r)^t
A = 235(1 + 0.1415)^2
A = $306.21
I = A - P
I = $306.21 - $235
I = $71.21
the interest was $71.21.
Next lets find the lifetime cost value:
Lifetime cost value = 306.21 + 5*1.56*52 + 5*0.78*52 = $914.61 (considering that 1 year = 52 weeks)
Now lets find the percentage what percentage the interest is of the lifetime cost:
(71.21/914.61)*100 = 7.79%
<span>← Previous Problem<span>Next Problem →</span></span>
It occurred in July 9, 1958. It occurred in Lituya Bay, Alaska.