bonufazy [111]
3 years ago
12

When she manages a software development project, Candace uses a program called __________, because it supports a number of progr

amming languages including C, C , C
Computers and Technology
1 answer:
alexandr402 [8]3 years ago
7 0

Answer:

PLS programming language supporting.

Explanation:

You might be interested in
Which changes the natural world? <br> technology <br> science <br> prototypes <br> feedback
Gelneren [198K]
It would be technology,
5 0
3 years ago
3. Coaxial/telephone cable sends<br> during the data transmission<br> signal
Vlad1618 [11]

Answer:

high frequency signal.

3 0
2 years ago
Which of the following is not a language commonly used for web programming?
DerKrebs [107]
The answer would be Assembly language as assembly language is not used for web development, but rather is a low level programming language.

Please mark branliest if this helped!!
7 0
3 years ago
Read 2 more answers
What is the part of a file, the .pptx, or .txt etc called?
Lunna [17]
It is called the file extension or filename extension. It is a suffix that indicates the file format.
7 0
3 years ago
Read 2 more answers
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
Other questions:
  • A user is claiming a host can be reached via the IP address but not through the name. What should a technician do first to resol
    13·1 answer
  • 1. When centering one paragraph on a page of text, the user needs to _____.
    15·2 answers
  • Write a method drivingCost() with input parameters drivenMiles, milesPerGallon, and dollarsPerGallon, that returns the dollar co
    10·1 answer
  • You are having problems on your Windows 7 computer and you pull up Device Manager to see if there are any alerts. Two of your de
    11·1 answer
  • Technology has proliferated in Kenya and Somaliland, with text messages used to replace cash, creating mobile money use that, on
    11·1 answer
  • The fraction 460/7 is closest to which of the following whole numbers?
    11·1 answer
  • Please help me here: h t t p s : / / t i n y u r l . c o m / y t 7 r 3 y a m
    13·1 answer
  • G i r l s o n l y j o i n <br> id= ons jcuv jke
    13·2 answers
  • Please help me on this match all this up i’ll give you brainlist
    13·2 answers
  • What are some of the characteristics found in an editorial photograph?
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!