20 hope this helped <333333333333333333333
Assume that the total overhead variance is x
We are given that the total labor variance is twice the total overhead variance. This means that, the total labor variance is 2x
Total variance can be calculated as follows:
Total variance = Total materials variance + Total overhead variance
+ Total labor variance
We have:
Total variance = $35000
Total materials variance = $14000
Total overhead variance = x
Total labor variance = 2x
Substitute in the equation and solve for x as follows:
35000 = 14000 + x + 2x
35000 - 14000 = 3x
21000 = 3x
x = 21000/3
x = 7000
Based on the above calculations:
Total overhead variance = x = $7000
Total labor variance = 2x = 2*7000 = $14000
Answer:
(d) All of the above
Step-by-step explanation:
In order to solve this question we will have to find out which numbers are located in which group (the group of numbers are U, B, B').
So lets start of with finding out what numbers are a part of group U. By looking at that picture we can see that all number on the graph are a part of group U. So.....
U = {0,1,2,3,4,5,6,7,8,9}
Then we can find out what numbers are part of the group B. We just have to include the numbers that are located within the circle and exclude all of the numbers out side of the circle. So........
B = {0,1,4,5,6,7,8}
We find numbers that are parts of group B' by using a similar method that we used to find out what numbers were part of group B (Just this time we include all numbers outside of the circle and exclude all of the numbers inside the circle). So ......
B' = {2,3,9}
Now we see that the right option is option d.
Answer:
pit it on -4 because your reflecting it on x
In equation form it would be the following:
2r + 3s = 13.
I believe.