Answer:
6.99 x 10⁻³ m³ / s
Explanation:
Th e pressure difference at the two ends of the delivery pipe due to atmospheric pressure and water column will cause flow of water.
h = difference in the height of water column at two ends of delivery pipe
6 - 1 = 5 m
Velocity of flow of water
v = √2gh
= √ (2 x 9.8 x 5)
= 9.9 m /s
Volume of water flowing per unit time
velocity x cross sectional area
= 9.9 x 3.14 x .015²
= 6.99 x 10⁻³ m³ / s
The answer is choice C
Explanation:
As during construction ,the site is cleared for all debris before laying out the foundation. Even the sewer lines are dug out .
So it will be useful for the construction crews to connect the pipes to the sewer lines before the foundation is poured.
But usually the steps take in construction activity is:- first the site is cleared for the foundation to be poured and once the foundation wall is set , then all utilities , including plumbing and electrical activities are done.,
After this process is over, the city inspector comes to check whether the foundation has been laid down as per the code of construction.
Only after that the rest of the construction activity follows through.
Answer:
diesel fuel is pumped at high pressure to the injectors which are responsible for entering the fuel into the combustion chamber,
when the piston is at the top the pressure is so high that it explodes the fuel (diesel) that results in a generation of mechanical power