Answer:
1.0 x 10^-3 m
Explanation:
1mm = (1/1000) m = 0.001m = 1.0 x 10^-3m (because to get 1.0, you have to movi the decimal point in the "0.001" three spots over to the right)
The correct answer is total revenue minus total cost.
When a firm is calculating the profit they need to find the difference between how much money they earned and how much they spent. The difference between their total revenue and their total cost is their profit.
Answer:
geotric earth simulator I think ya I have no idea