1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
marshall27 [118]
3 years ago
13

Will a roller coaster with a higher starting point be a faster ride? Why or why not

Physics
1 answer:
Brilliant_brown [7]3 years ago
8 0

Answer:

yez

Explanation:

You might be interested in
As an ice cube melts, its molecules
fomenos

Answer:

A. absorb heat energy and move farther apart

Explanation:

The answer is A since when a ice cube takes in heat, it changes form and melts down to a liquid : water.

The molecules in water are farther apart since they are moving around alot but can be contained in a container.

3 0
3 years ago
The diagram below shows a closed system of two tanks that each contain water.
lidiya [134]
Lmalemwlsnlenekenfndelenekf
4 0
3 years ago
How does the force of gravity between two bodies change when the distance between them doubles?
polet [3.4K]

Answer:

If the distance is doubled, the force of gravity between the two bodies is one-fourth as strong as before

Explanation:

The force of gravity between two bodies depends on the mass and distance. But we will focus on distance since that's what the question asks

Therefore, the force of gravity decreases as distance between the bodies increases.

7 0
3 years ago
The human ear canal is about 2.6 cm long and can be regarded as a tube open at one end and closed at the eardrum. What is the fu
Ugo [173]

Answer:

f = v/λ

 = v/4*L

 = 343 / 4 (0.026)

= 3120 Hz  

8 0
3 years ago
Read 2 more answers
Calculate the work done if a boy lifts a bag of cement 500N to the floor of a lorry 2.5m above the ground
eduard

Answer:

W = 1250 J = 1.25 KJ

Explanation:

The work done by the boy is due to the change in the position of the cement vertically. Hence, the work done in this case will be equal to the potential energy of the cement:

W = P.E\\W = mgh

where,

W = Work done = ?

mg = W = weight of cement = 500 N

h = height covered = 2.5 m

Therefore,

W = (500\ N)(2.5\ m)

<u>W = 1250 J = 1.25 KJ</u>

4 0
3 years ago
Other questions:
  • A 40 N crate rests on a rough horizontal floor. A 12 N horizontal force is then applied to it. If the coecients of friction are
    7·1 answer
  • What is the acceleration of a 30.0-kg go kart if the thrust of its engine is 300.0 N?
    12·2 answers
  • A force sets an object in motion when the force is multiplied
    15·1 answer
  • A force has to have what two factors? Magnitude and Velocity. Velocity and Acceleration. Magnitude and Direction. Size and Speed
    5·1 answer
  • Johannes Kepler started his astronomy career as an assistant to??
    9·1 answer
  • Question 10 of 10
    10·1 answer
  • The front and rear sprockets on a bicycle have radii of 8.40 and 4.91 cm, respectively. The angular speed of the front sprocket
    10·2 answers
  • Mercury is in the 80th position in the periodic table. How many protons does it have?
    12·2 answers
  • The distance of the force from the axis of rotation is called?
    9·1 answer
  • Soap bubbles can display impressive colors, which are the result of the enhanced reflection of light of particular wavelengths f
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!