This is the concept of volume of solid materials. Volume is of a rectangular prism is given by:
volume=length*width*height
length=6 units
width=3 units
height=4 units
thus;
volume=6*3*4=72 cubic units
I tried my best with 1, 2, and 3
I'm pretty sure this is the answer:
(10)sin(40°) = AC
It's <em>sin </em>becasue it <em>needs </em>the opposite side of 40° and <em>has </em>the hypotenuse.
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
Calculate the Difference Quotient for f(x)=2x^2-3
Find f(x+h) and f(x), and plug these values into the difference quotient formula.
<h2><em><u>
4x+2h</u></em></h2>