Answer:
Option D
Explanation:
The work done can be given by the mechanical energy used to do work, i.e., Kinetic energy and potential energy provided to do the work.
In all the cases, except option D, the energy provided to do the useful work is not zero and hence work done is not zero.
In option D, the box is being pulled with constant velocity, making the acceleration zero and thus Kinetic energy of the system is zero. Hence work done in this case is zero.
Answer:
option 1 will be the answer.
Explanation:
hope it helps.
Answer:
X=92.49 m
Explanation:
Given that
u= 21 m/s
h= 97 m
Time taken to cover vertical distance h
h= 1/2 g t²
By putting the values
97 = 1/2 x 10 x t² ( g = 10 m/s²)
t= 4.4 s
The horizontal distance
X= u .t
X= 21 x 4.4
X=92.49 m
When conducting and experiment you want to have a notebook and something to write down notes with so you can keep everything organized and proper, and to not miss anything in the experiment. Also you want to have everything in order of the way it should be in.
I hope you found this helpful!
from rarefaction to rarefaction for a longitudinal wave