Answer:
The number of times it would take more than 27 minutes to manufacture a pair of running shoes is 2.275 times or approximately 2 times per every 100 shoes
Step-by-step explanation:
The average time it takes to manufacture a pair of shoes = 21 minutes;
The standard deviation = 3 minutes
To find how often it takes more than 27 minutes to manufacture a pair of running shoes, we have;
Standard score, given as follows;

Where;
x = The raw score = 27 minutes
μ = The average score = 21 minutes
σ = The standard deviation = 3 minutes
From which we have;

Therefore, it is borderline unusual with a p value of P(z>2) = 1 - 0.97725 = 0.02275
Therefore, the number of times out of 100 that it would take more than 27 minutes to manufacture a pair of running shoes = 100 × 0.02275 = 2.275 times which is approximately 2 times in every 100 shoes.
Answer: Yes
Step-by-step explanation:
5(-2) + 4(7) = 18
-10 + 28 = 18
28 - 10 =18
18=18
The zeros to the problem are:
x = .90283246
x = 4.4305009
Answer:
0.3571
Step-by-step explanation:
Hope this helps!