Answer:
Option D
All the above
Explanation:
Depending with the number of occupants in a building, the number of air conditioners required can either be increased or reduced. For instance, if the building is to be a classroom of over 50 students, 1 air-conditioner can't serve effectively. Similarly, the activity of occupants also dictate the amount of air conditioners required since if it's a gym room where occupants exercise often then the air conditioners required is different from if the room was to serve as a lounge. The appliances that also operate in a room require that air conditioners be installed as per the heat that may be generated by the appliances.
Answer:
as slated in your solution, if delay time is 2.30 mins, hence 9 vehicle will be on queue as the improved service commenced.
Explanation:
4 vehicle per min, in 2 mins of the delay time 8 vehicles while in 0.3 min average of 1 vehicle join the queue. making 9 vehicle maximum
Answer:
Explanation:
Find attached the solution to the question
Answer:
Yes this claim is correct.
Explanation:
The shear stress at any point is proportional to the velocity gradient at any that point. Since the fluid that is in contact with the pipe wall shall have zero velocity due to no flow boundary condition and if we move small distance away from the wall the velocity will have a non zero value thus a maximum gradient will exist at the surface of the pipe hence correspondingly the shear stresses will also be maximum.