Answer:
a) 28 stations
b) Rp = 21.43
E = 0.5
Explanation:
Given:
Average downtime per occurrence = 5.0 min
Probability that leads to downtime, d= 0.01
Total work time, Tc = 39.2 min
a) For the optimum number of stations on the line that will maximize production rate.
Maximizing Rp =minimizing Tp
Tp = Tc + Ftd
At minimum pt. = 0, we have:
dTp/dn = 0
Solving for n²:
The optimum number of stations on the line that will maximize production rate is 28 stations.
b)
Tp = 1.4 +1.4 = 2.8
The production rate, Rp =
The proportion uptime,
Answer:
resistance
Explanation:
A strain gauge changes resistance with applied strain.
Answer:
no⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀
Answer:
1.1451 x 104 (11451.13)mg/m3
Explanation:
1 ppmv is defined as one volume of a contaminant or solid(CO)(mL) in 1 x 106 volume of solvent/water.
1ppmv = 1mL/m3
Concentration in mg/m3 = volume in ppm x molecular weight x pressure(kPa)/( gas constant x temperature(K)
Molecular weight of CO = 12 + 16
= 28g/mol
Temperature = 273.15 + 25
= 298.15K
Pressure = 1 x 101.325kPa
= 101.325kPa
Ppmv = 1 x 10-4ppmv
Gas constant, R = 8.3144 L.kPa/mol.K
Concentration in mg/m3 = (1 x 104 * 28 * 101.325)/(8.3144 * 298)
= 1.1451 x 104mg/m3
= 11451.13 mg/m3