The maximum shear stress in the tube when the power is transmitted through a 4: 1 gearing is 28.98 MPa.
<h3>What is power?</h3>
Power is the energy transferred per unit time.
Torque is find out by
P = 2πNT/60
10000 = 2π x 2000 x T / 60
T =47.74 N.m
The gear ratio Ne / Ns =4/1
Ns =2000/4 = 500
Ts =Ps x 60/(2π x 500)
Ts =190.96 N.m
Maximum shear stress τ = 16/π x (T / (d₀⁴ - d₁⁴))
τ max =T/J x D/2
where d₁ = 30mm = 0.03 m
d₀ = 30 +(2x 4) = 38mm =0.038 m
Substitute the values into the equation, we get
τ max = 16 x 190.96 x 0.038 /π x (0.038⁴ - 0.03⁴)
τ max = 28.98 MPa.
Thus, the maximum shear stress in the tube is 28.98 MPa.
Learn more about power.
brainly.com/question/13385520
#SPJ1
Answer:
2.379m
Explanation:
The width = 23m
The depth = 3m
The radius is denoted as R
The wetted area is = A
The perimeter perimeter = P
Hydraulic radius
R = A/P
The area of a rectangular channel
= Width multiplied by Depth
A = 23x3
A = 69m²
Perimeter = (2x3)+23
P = 6+23
P= 29
Hydraulic radius R = 69/29
= 2.379m
This answers the question
Thank you!
Answer:
The term Accuracy means that how close our result to the original result.
Suppose we do any experiment in laboratory and we calculate mass = 7 kg but answer is mass = 15 kg then our answer is not accurate.
And the term Precision means how likely we get result like this.
Suppose we do any experiment in laboratory and we calculate mass five times and each time we get mass = 7 kg then our answer is precised but not accurate.
Answer: P = I2R = 0.032 x 1000 =0.9 W
Explanation: The power will be the product of the square of the current and
the resistance of the load. The fact that the circuit is a parallel circuit is irrelevant to this question.
Answer:
Procurement Process
Explanation:
Procurement Process describes the series of activities that an organization partakes in to get products or services in order to achieve their goals. The choice of the procurement process is very important for the success of a construction project.
So during a bidding process, the procurement process is section where the organization will need to get water and other utilities, sanitation equipment or storage needed for the success of a construction project.