Answer:
Carpenter — A carpenter is someone who works with wood. They build houses and make cabinets etc.
Logging — Loggers are people who cut trees. They use strong chain saws to cut trees.
Shipwrights — Shipwrights build, design, and repair all sizes of boats.
Wood Machinist — Wood Machinists repair and cut timber or any kind of wood for construction projects. They also operate woodworking machines, as their name suggest.
Furniture finishers — Furniture finishers shape, decorate, and restore damaged and worn out furniture.
Answer:
Federal agencies
Explanation:
NIST (National Institute of Standards and Technology) also called between 1901 and 1988 National Bureau of Standards (NBS), it is an agency of the Technology Administration of the United States Department of Commerce. The mission of this institute is to promote innovation and industrial competition in the United States through advances in metrology, standards and technology in ways that improve economic stability and quality of life.
As part of this mission, NIST scientists and engineers continually refine the science of measurement (metrology) by creating precise engineering and manufacturing required for most current technological advances. They are also directly involved in the development and testing of standards made by the private sector and government agencies. The NIST was originally called the National Bureau of Standards (NBS), a name it had from 1901 to 1988. The progress and technological innovation of the United States depends on the abilities of the NIST, especially if we talk about four areas: biotechnology , nanotechnology, information technologies and advanced manufacturing.
Answer:0.2A
Explanation:
First, write KCL
i1-i2-i3=0
Then, replace currents with viltages and resistors.
V2-10v/100-v2/200-v2/400=0
V2-40=0
V2=40v
I hope it was helpful
Answer:
Explanation:
The Turnaround time is the amount of time that elapses between the job arriving and completing. We assume that all jobs arrive at time 0, the turnaround time will simply be the time that they complete.
Round Robin:
we assume that the time quantum of the scheduler is 1 second.The table below gives a break down of which jobs will be processed during each time quantum. A asterisk(*) indicates that the job completes during that quantum.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
A B C D E A B C* D E A B D E A B D* E A B E A B* E A E A E* A A
C* = 8
D*=17
B*=23
E*=28
AVERAGE TURNAROUND = (8+17+23+28+30)/5 =106/5 = 21.2 MINUTES
B) PRIORITY SCHEDULING:
1-6 7-14 15-24 25-26 27-30
B E A C D
AVERAGETURNAROUND =(6+14+24+26+30)/5 = 100/5 = 20 MINUTES.
C)FCFS
1-10 11-16 17-18 19-22 23-30
A B C D E
AVERAGE TURNAROUND =(10+16+18+22+30)/5 = 96/5=19.2 MINTUES
D)SJF
1-2 3-6 7-12 13-20 21-30
C D B E A
AVERAGE TURNAROUND - (2+6+12+20+30)/5 =70/5 =14 MINUTES.
Answer:
A) After 2.5 milliseconds
Explanation:
Given that :
In a CAN bus, there are three computers: Computer A, Computer B, and Computer C.
Length in time of the message sent are 2 milliseconds long
As the computer start sending the message; the message are being sent at a message duration rate of 2 milliseconds
250 microseconds later, Computer B starts to send a message; There is a delay of 250 microseconds = 0.25 milliseconds here at Computer B
and 250 microseconds after that, Computer C starts to send a message
Similarly; delay at Computer C = 0.25 milliseconds
Assuming
is the retransmit time for Computer A to retransmit its message, Then :
= 
= 2 milliseconds + 0.25 milliseconds + 0.25 milliseconds
= 2.5 milliseconds
Thus; the correct option is A) After 2.5 milliseconds