Answer:
286.7 m
Explanation:
So we are assuming the PE of the falcon is converted to KE
KE = PE
1/2 (.480)(75)^2 = .480 (9.81)(h ) solve for h = 286.7 m
Answer:
Explanation:
Given that
Superelation= 0.08ft/ft
Given curve= u•
Curve junction factor= 0.13
DR= 5729.57795
R = 5729.57795/D
R = 5729.57795/4
R = 1432.4ft
c + f = V^2/gG
0.08 + 0.13 = V^2 / (32*1432.4)
V^2 = 9625.728 or V = 98 ft/sec
The designed speed for a project considered is a minimum value which means the highway design elements will meet or exceed the standards for the design speed. The maximum safe speed under normal condition is significantly greater than design speed
Answer:
I think the answer is a no. I guess
Explanation:
don't mind if it is write or wrong
The Earth takes very nearly (365 and 1/4) days to go around the sun.
If our calendar always had 365 days, then the year would end and re-start
too soon, and the beginning of Spring (and every other season) would
eventually drift into the months after March.
If our calendar always had 366 days, then the year would end and re-start
too late, and the beginning of Spring (and every other season) would
eventually drift into the months before March.
We can't make calendars with an extra quarter-day in each year. But we
keep them lined up with the real year by saving up the quarters, and adding
one full day to the calendar every 4 years.
You want to know how to solve it?