Answer: The answer is C - clean room.
Explanation: You prepare a sterile IV medication in a clean room. A fume hood is used in a kitchen. You prepare a sterile IV medication in a clean room, ISO class 7 and inside that room is an ISO class 5 area - either an area that achieves this or inside a primary engineering control. A PEC is a laminar air flow hood - either horizontal or vertical. Or, if you do not have an ISO class 7 area, you can use a biological safety cabinet or Compounding Aseptic (CAI) and Containment Isolators (CACI) that can be certified to use a room that is less than ISO class 7. The only reason you would ever prepare a sterile IV medication on a counter is in an emergency situation for "immediate use." Immediate use is defined as the entire contents will be used within 60 minutes of the preparation.
Answer:
carpenter?
Explanation:
im just guessing so i hope thats right sorry if its wrong
Answer:
Muscle Build and Building a tolerance
Explanation:
As you work out or even just moving excessively, your muscles tear in tiny amounts to heal the body sends cell to patch up that area over time the cells will just keep stacking up. This is where the tolerance comes in since their is so many cells built up its harder for them to "rip" It sounds like a huge rip but its more of a tiny little rip not even enough to hurt.(until the next day.)
Answer:
Steam generators and steam supply.
The pre and post vacuum phase of the sterilization cycle.
The autoclave jacket.
The cooling process.
The autoclave control systems.
connections between cancer patients hospitalized for symptoms and healthcare utilization and patient-reported care satisfaction
What is healthcare?
It offers comprehensive care for health requirements across the lifespan, not only for a collection of particular disorders. Primary health care guarantees that patients receive high-quality, all-encompassing care that is as close as practical to their daily environments, spanning from promotion and prevention through treatment, rehabilitation, and palliative care.
From September 2014 to April 2017, we prospectively enrolled individuals who had cancer and unanticipated hospitalizations. We evaluated patients' physical, psychological, and emotional symptoms at the time of admission, as well as their satisfaction with their care (FAMCARE items: satisfaction with care coordination and timeliness of symptom treatment). We used regression models to find characteristics that affect care satisfaction and relationships between satisfaction and symptom load and length of hospital stay (LOS).
The majority of the 1,576 participants expressed "satisfaction" or "very satisfaction" with care coordination (90%) and the promptness of symptom treatment (89%).
High levels of care satisfaction are reported by cancer patients who are hospitalized, and these levels are associated with older age and admission to an oncology service. The significance of enhancing symptom management and care coordination in this population is highlighted by the relationships between higher care satisfaction, lower symptom load, and shorter hospital LOS.
To learn more about healthcare, click on the link below –
brainly.com/question/9993770
#SPJ4