Answer:
C!
Step-by-step explanation:
Answer:
0.6170
Step-by-step explanation:
Given that a manufacturing process is designed to produce bolts with a 0.25-in. diameter.
i.e. no of bolts which are produced as per standard is X means then
X is normal with mean = 0.250 and std dev = 0.04
No of bolts tested = 36
If this mean falls outside the interval (0.230,0.270) the production would be shut down.
i.e. P(|x-25|>0.20) =production shut down probability

Answer:
Look at the picture for the answer :D
Step-by-step explanation:
The x coordinate comes first, then the y.
Answer:
y=90x+2,000
Step-by-step explanation:
90 is the rate of change because the hot air balloon descends 90 feet per minute.
And 2,000 is the starting point because the hot air balloon started the descent at 2,000 feet.
At day 7, the four-day moving average for the price of the stock would be $58.25.
<h3>What is the four-day moving average at day 7?</h3>
This can be found as:
= (Day 7 price + Day 6 + Day 5 + Day 4) / Number of days
Solving gives:
= (59 + 55 + 59 + 60) / 4
= 233 / 4
= $58.25
Find out more on moving averages at brainly.com/question/15188858.
#SPJ1