Answer:
Among the different types of excavation protection system, as a way of preventing accidents against cave-ins, the sloping involves cutting back the trench wall at an angle inclined away from the excavation. Shoring requires installing aluminum hydraulic or other types of supports to prevent soil movement and cave-ins. Shielding protects workers by using trench boxes or other types of supports to prevent soil cave-ins (OSHA). In addition, the regulations do not allow employees to work on excavations where there is an accumulation of water. If this occurs, water on the site must be constantly removed by suitable equipment preventing water from accumulating. The entry of surface water into the excavations must also be prevented by means of diversion ditches, dam, or other suitable means.
Explanation:
Answer:
The amount of energy transferred to the water is 4.214 J
Explanation:
The given parameters are;
The mass of the object that drops = 5 kg
The height from which it drops = 86 mm (0.086 m)
The potential energy P.E. is given by the following formula
P.E = m·g·h
Where;
m = The mass of the object = 5 kg
g = The acceleration de to gravity = 9.8 m/s²
h = The height from which the object is dropped = 0.086 m
Therefore;
P.E. = 5 kg × 9.8 m/s² × 0.086 m = 4.214 J
Given that the potential energy is converted into heat energy, that raises the 1 g of water by 1°C, we have;
The amount of energy transferred to the water = The potential energy, P.E. = 4.214 J.
Answer:
Amount of concrete need to make slab = 1,500 feet³
Explanation:
Given:
Length of slab = 50 feet
Width of slab = 30 feet
Height of slab = 1 feet
Find:
Amount of concrete need to make slab
Computation;
Amount of concrete need to make slab = Volume of cuboid
Volume of cuboid = (l)(b)(h)
Amount of concrete need to make slab = (50)(30)(1)
Amount of concrete need to make slab = 1,500 feet³