Answer:
it would affect the distance the antiantibodies diffuse from the disk
Explanation:
Answer:
// The method is defined with a void return type
// It takes a parameter of integer called numCycles
// It is declared static so that it can be called from a static method
public static void printShampooInstructions(int numCycles){
// if numCycles is less than 1, it display "Too few"
if (numCycles < 1){
System.out.println("Too few.");
}
// else if numCycles is less than 1, it display "Too many"
else if (numCycles > 4){
System.out.println("Too many.");
}
// else it uses for loop to print the number of times to display
// Lather and rinse
else {
for(int i = 1; i <= numCycles; i++){
System.out.println(i + ": Lather and rinse.");
}
System.out.println("Done");
}
}
Explanation:
The code snippet is written in Java. The method is declared static so that it can be called from another static method. It has a return type of void. It takes an integer as parameter.
It display "Too few" if the passed integer is less than 1. Or it display "Too much" if the passed integer is more than 4. Else it uses for loop to display "Lather and rinse" based on the passed integer.
Answer:
hello your question is incomplete attached below is the complete question
A) overall mean = 5.535, standard deviation ≈ 0.3239
B ) upper limit = 5.85, lower limit = 5.0
C) Not all the samples meet the contract specifications
D) fluctuation ( unstable Asphalt content )
Explanation:
B) The daily average asphalt content has to obtained in order to determine the upper and lower control limits using an average asphalt content of 5.5% +/- 0.5% everyday
The upper limit : 14 may = ( 5.8 + 5.1 ) / 2 = 5.85
The lower limit : 16 may = ( 5.2 + 4.8 ) / 2 = 5.0
attached below is the required plot
C ) Not all the samples meet the contract specifications and the samples that do not meet up are samples from :
15 may and 16 may . this is because their Asphalt contents are 6.2 and 4.8 respectively and sample number 18 and 20
D ) what can be observed is that the ASPHALT content fluctuates between the dates while the contract specification is fixed
H is the answer
Step by step
Answer:
Three material considerations are;
1. Identify and appraise the attainment of the goal of the with the design specification
2. Ascertain the required load the product being designed will experience and the suitability of the design specification to that load
3. Review the producibility of the design to ensure that it can be produced with the available technology
Explanation:
1. The appraisal of the design includes the consideration of the factors of the design and the building of reliability and efficiency into the design from the beginning
2. Ascertain if the product will require toughness, elasticity, and if will be subject to sudden or repeated loading conditions
3. Ensure that the design can be readily produced with the accessible manufacturing equipment during the conceptualization stage of the design.