Answer:
1275J
Explanation:
Given parameters:
Force on box = 85N
Distance moved = 15m
Unknown:
Work done = ?
Solution:
Work done is the amount of force applied on a body to move it through a specific distance.
Work done = Force x distance
Now insert the parameters and solve;
Work done = 85 x 15 = 1275J
Answer:
233.1 miles per hours
Explanation:
Speed: This is defined as the ratio of distance to time. The S.I unit of speed is m/s. speed is a vector quantity because it can only be represented by magnitude only. Mathematically, speed can be expressed as,
S = d/t ....................... Equation 1
Where S = speed of the runner, d = distance covered, t = time.
Given: d = 100 meter , t = 9.580 seconds
Conversion:
If, 1 meter = 0.00062 miles
Then, 100 meters = (0.00062×100) miles = 0.62 miles.
Also
If, 3600 s = 1 h
Then, 9.580 s = (1×9.580)/3600 = 0.00266 hours.
Substitute into equation 1
S = 0.62/0.00266
S = 233.1 miles per hours.
Hence the runner speed is 233.1 miles per hours
Look at the third one i think its the answer
Answer:
<h2>602.08 N</h2>
Explanation:
The force supplied by the train can be found by using the formula

w is the workdone
d is the distance
From the question we have

We have the final answer as
<h3>602.08 N</h3>
Hope this helps you
The strength of the gravitational force between two objects depends on two factors, mass and distance. the force of gravity the masses exert on each other. If one of the masses is doubled, the force of gravity between the objects is doubled. increases, the force of gravity decreases.