The total work done is 5980 Joules and the power expended is 57 Watts.
<h3>What is work done?</h3>
The work done is the work done in the gravitational field as the bucket is raised up Thus work required to remove the bucket Wb;
Wb = 13.9 kg * 25.9 m * 9.8 m/s^2 = 3530 Joules
Height of the center of mass of chain = 25.9 / 2 = 12.95 m
Work done by the chain Wc;
Wc = 12.95 * 19.3 * 9.8 = 2450 Joules
Total work = 3530 + 2450 = 5980 Joules
Power expended = W / t = 5980 J / 105 sec = 57 J/s = 57 Watts
Learn more about work done:brainly.com/question/13662169
#SPJ1
Answer:
The cable run exceeds the specifications for Ethernet over twisted pair
Explanation:
The ethernet network's router also serves as a bridge to the Internet. The router connects to the modem, which carries the Internet signal, sending and receiving data packet requests and routing them to the proper computers on the network.
Ethernet is a way of connecting computers together in a local area network or LAN. It has been the most widely used method of linking computers together in LAN s since the 1990 s.
The basic idea of its design is that multiple computers have access to it and can send data at any time.
Answer:
Answers 2.( a) . (i)Total potential difference provided by the four cell = 4x 1.5 Volts = 6.0 Volts (ii)The component of X is a variable resistor .
Explanation:
hope it helps
68% So 68/100 of freshwater is found in ice