Answer:
6.5 hours
Step-by-step explanation:
First try to find the rate he can paint per hour
375 ÷ 3 = 125 ft^2 per hour
Then try to find how long it should take it for him to paint 812.5 sq ft
812.5 ÷ 125 = 6.5 hours
The mean will be 5 points higher...so...c would be the answer!
Remark
A kite is constructed such that AB = BC and AD = DC. AB = sqrt( (1/2)AC + 18^2) see diagram. AD = sqrt(24^2 + 32^2)
Step One
Solve for AB
1/2 AC = 24 (AC is given as 48)
18 is a given length
AB = sqrt(24^2 + 18^2) = sqrt(576 + 324) = sqrt(900) = 30
Step Two
Find the length of AD
AD = sqrt(32^2 + 24^2) = sqrt(1024 + 576) = sqrt(1600) = 40
Step Three
Find the Perimeter.
P = 2 * 30 + 2*40 = 60 + 80 = 140
P = 140 <<<<< Answer
Answer:
-4
Step-by-step explanation:
(4-2)^3 - 3*4
PEMDAS
P arentheses
(2)^3 - 3*4
E xponents
8 -3*4
MD multiply and divide from left to right
8 - 12
AS add and subtract from left to right
-4