Answer:
51.4 Ohms
Explanation:
By applying voltage division rule
where v is voltage, subscripts i and f represnt initial and final, R is resistance, m is internal and l is external.Substituting 7V for final voltage, 10V for initial voltage and the external resistance as 120 Ohms then

Explanation:
Production planning: Planning is ideal so that there are the right resources, at the right time and in the right quantity that can meet the production needs of a period.
Strategies: The strategic development of production is the area that will assist in organizational competitiveness and in meeting consumer demand and needs.
Product and service design: Development of new products and services and their improvement, innovations and greater benefits
Production systems: Study of physical arrangements so that production takes place effectively according to the ideal layout for each type of product or service.
Production capacity planning: Analysis of the short, medium and long term related to production, and identification if necessary to obtain more resources, increase in staff, machinery, etc., to meet present and future demands.
<em>Each area of knowledge acquired will assist in the development of a professional career, as technical knowledge is essential in decision-making, provision, problem solving, the development of new ideas and innovation.</em>
In general, bury metal conduits at least 6 inches below the soil surface. You may also run them at a depth of 4 inches under a 4-inch concrete slab. Under your driveway, the conduits must be below a depth of 18 inches, and under a public road or alleyway, they must be buried below 24 inches.