Answer:
VR Prototyping
VR Prototyping Can Save you Thousands of Dollars.
Explanation:
there you go lad
Answer:
The power developed in HP is 2702.7hp
Explanation:
Given details.
P1 = 150 lbf/in^2,
T1 = 1400°R
P2 = 14.8 lbf/in^2,
T2 = 700°R
Mass flow rate m1 = m2 = m = 11 lb/s Q = -65000 Btu/h
Using air table to obtain the values for h1 and h2 at T1 and T2
h1 at T1 = 1400°R = 342.9 Btu/h
h2 at T2 = 700°R = 167.6 Btu/h
Using;
Q - W + m(h1) - m(h2) = 0
W = Q - m (h2 -h1)
W = (-65000 Btu/h ) - 11 lb/s (167.6 - 342.9) Btu/h
W = (-65000 Btu/h ) - (-1928.3) Btu/s
W = (-65000 Btu/h ) * {1hr/(60*60)s} - (-1928.3) Btu/s
W = -18.06Btu/s + 1928.3 Btu/s
W = 1910.24Btu/s
Note; Btu/s = 1.4148532hp
W = 2702.7hp
Answer:
$7,778.35
Explanation:
At year 3, the final payment of the remaining balance is equal to the present worth P of the last three payments.
First, calculate the uniform payments A:
A = 12000(A/P, 4%, 5)
= 12000(0.2246) = 2695.2 (from the calculator)
Then take the last three payments as its own cash flow.
To calculate the new P:
P = 2695.2 + 2695.2(P/A, 4%, 2) = 2695.2 + 2695.2(1.886) = 7778.35
Therefore, the final payment is $7,778.35
Answer:

Explanation:
The first thing we will do is convert the units. Miles per hour to meters per second.


Performing the operations

Now, we will use the acceleration formula

Where v = speed and t = time
Substituting the values of 