AleksAgata [21]
3 years ago
7

Seattle-Pipes Co. produces pipes to be supplied to a Seattle utility company. The requirement of the utility company is that the

pipes need to be 200 cm long. Longer pipes are acceptable to the utility company but any pipe less than 200 cm is rejected. Seattle-Pipes loses all its production costs on pipes that are rejected. The production process is such that it has some variability in the lengths of pipes produced, and this variability can be well approximated by a Normal distribution. Seattle- Pipes can adopt one of the following three production processes:
Process A: Produces pipes with an average length of 200 cm and a standard deviation of 0.5 cm
Process B: Produces pipes with an average length of 201 cm and a standard deviation of 1 cm
Process C: Produces pipes with an average length of 202 cm and a standard deviation of 1.5 cm
a. If Seattle-Pipes adopts the third Process (Process "C'), what is the probability it will have its pipe rejected by the utility company? Enter your answer as a decimal probability (not a percent) rounded to 4 decimal places.
b. Seattle-Pipes temporarily changes its requirements and has a new requirement that it will accept any pipe of length from 199 cm to 202 cm. That is, pipes ranging in length from 199 cm to 202 cm will be accepted, others will be rejected. With this changed requirement, which production process (out of the 3) will result in the smallest percentage of rejections?
c. Seattle-Pipes earns a revenue of $200 for every pipe that gets accepted and loses all money for any pipe that is rejected. The cost of producing the pipes is $140 per pipe if the production process "A" is used, $160 per pipe if the production process "B" is used, and $177 per pipe if the production process "C" is used. Given this information, which production process would you recommend maximizing profits (revenue minus cost) if the requirement of the utility company is that pipes need to be of 200 cm (or more and any pipe shorter than 200 cm is rejected?
Mathematics
1 answer:
g100num [7]3 years ago
4 0

Answer:

Step-by-step explanation:

Hello!

The study variable is

X: Pipe length.

It is known that this variable has a normal distribution and that the distribution parameter varies depending on the process used to manufacture the pipes.

Process A: μ= 200cm δ= 0.5cm

Process B: μ=201cm δ= 1cm

Process C: μ=202cm δ= 1.5cm

Pipes with a length of 200cm or more will be accepted by the utility company (X≥200), but pipes with less than 200cm length will be rejected (X<200)

a. Using Process C, you need to calculate the probability that the pipe will be rejected, symbolically:

P(X<200)

Using the distribution data of process C you have to standardize the value:

P(Z<(200-202)/1.5)= P(Z<-1.33)= 0.09176

b. The requirements change, accepting any pipe between 199 and 202, you have to calculate the probabilities of the pipes being between those lengths using the three process:

Process A:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-200)/0.5)) - P(Z≤(199-200)/0.5))

P(Z≤4) - P(Z≤-2) = 1 - 0.02275 = 0.97725

The probability of the pipe being rejected is 0.02275

Process B:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-201)/1)) - P(Z≤(199-201)/1))

P(Z≤1) - P(Z≤-2) = 0.84134 - 0.02275 = 0.81859

The probability of the pipe being rejected is 1-0.81859= 0.18141

Process C:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-202)/1.5)) - P(Z≤(199-202)/1.5))

P(Z≤0) - P(Z≤-2) = 0.5 - 0.02275 = 0.47725

The probability of the pipe being rejected is 1-0.47725= 0.52275

The pipes manufactured using process A has fewer chances of being rejected.

c.

Process A costs $140

P(X≥200)= 1 - P(X<200)= 1 - P(Z<0)= 1 - 0.5= 0.5

Process B costs $160

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1)= 1 - 0.15866= 0.84134

Process C costs $177

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1.33)= 1 - 0.09176= 0.90824

If they where to make 100 pipes:

Using process A: 100*0.5= 50 pipes will be accepted, so they'll win 50*($200-$140)= $3000

Using process B: 100*0.84134= 84.134≅ 84 pipes will beaccepted, so they'll win 84*($200-$160)= $3360

Using the process C: 100*0.90824= 80.824≅ 90 pipes will be accepted, so they'll win 90*($200-$177)= $2070

As you can see, using process B will maximize the profits.

I hope it helps!

You might be interested in
|(x-19)+11|<br><br> , if x &gt; <br> , if x = <br> , if x &lt; <br> i'll give brainlyest
12345 [234]

which sedimentbcan bestvdescribe we power how can ubsee

Step-by-step explanation:

dw

4 0
3 years ago
Read 2 more answers
SENORMATHWIZ AM I CORRECT HURRY I HAVE 5 MIN!!!!
Flauer [41]

Answer:

its actually c

Step-by-step explanation:

6*10=60+40=100

100\geq100

4 0
3 years ago
Read 2 more answers
4. BASEBALL CARDS Ren and Chet nave
cricket20 [7]

Answer:

Chet has 14 baseball cards.

Step-by-step explanation:

Ren has 27 cards, which is 13 more than what Chet has.  So you subtract.  27-13=14.

5 0
4 years ago
IMAGE IS DOWN BELOW!!<br> SOMEONE PLEASE HELP ME!!<br> ILL GIVE YOU BRAINLIST ANSWER AND POINTS!!
Svetach [21]
9^2+11^2=x^2
81+121=x^2
x^2=202
x=14.2
6 0
2 years ago
Read 2 more answers
Help now plzzzzzzz:3 :3 :3 :3 :3. :3
PSYCHO15rus [73]

Answer:C

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
Other questions:
  • The interest on an investment varies directly as the rate of interest. If the interest is ​$41 when the interest rate is 4​%, fi
    6·2 answers
  • What is the measure of angle y in this figure?​
    10·1 answer
  • Approximately how many times greater is 5×108 than 8×105 ?
    6·2 answers
  • Solve the following system of equations and show all work. Please help!!! y = 2x2 y = –3x −1
    13·2 answers
  • Population Proportion: unknown Sample Proportion: ˆ p = 0.86 Sample size: n = 169 1. Based on the sample, give a point estimate
    10·1 answer
  • A. 110<br> B. 50 <br> pls help asap !!!!!
    13·2 answers
  • PLSSSSS HELP I GIVE U ANYTHING JUST PLZ HELP!!!!!!!!!!!!
    15·2 answers
  • Can someone give me the working out for 63000 divide by 90. I know the answer is 700 but i need to know how i got the answer ple
    12·1 answer
  • Ava has 2 dozen pencils. 3/8 of them are sharpened. how many of them are sharpened?
    11·1 answer
  • Solve P=2G + 2M for G.<br> G=
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!