AleksAgata [21]
3 years ago
7

Seattle-Pipes Co. produces pipes to be supplied to a Seattle utility company. The requirement of the utility company is that the

pipes need to be 200 cm long. Longer pipes are acceptable to the utility company but any pipe less than 200 cm is rejected. Seattle-Pipes loses all its production costs on pipes that are rejected. The production process is such that it has some variability in the lengths of pipes produced, and this variability can be well approximated by a Normal distribution. Seattle- Pipes can adopt one of the following three production processes:
Process A: Produces pipes with an average length of 200 cm and a standard deviation of 0.5 cm
Process B: Produces pipes with an average length of 201 cm and a standard deviation of 1 cm
Process C: Produces pipes with an average length of 202 cm and a standard deviation of 1.5 cm
a. If Seattle-Pipes adopts the third Process (Process "C'), what is the probability it will have its pipe rejected by the utility company? Enter your answer as a decimal probability (not a percent) rounded to 4 decimal places.
b. Seattle-Pipes temporarily changes its requirements and has a new requirement that it will accept any pipe of length from 199 cm to 202 cm. That is, pipes ranging in length from 199 cm to 202 cm will be accepted, others will be rejected. With this changed requirement, which production process (out of the 3) will result in the smallest percentage of rejections?
c. Seattle-Pipes earns a revenue of $200 for every pipe that gets accepted and loses all money for any pipe that is rejected. The cost of producing the pipes is $140 per pipe if the production process "A" is used, $160 per pipe if the production process "B" is used, and $177 per pipe if the production process "C" is used. Given this information, which production process would you recommend maximizing profits (revenue minus cost) if the requirement of the utility company is that pipes need to be of 200 cm (or more and any pipe shorter than 200 cm is rejected?
Mathematics
1 answer:
g100num [7]3 years ago
4 0

Answer:

Step-by-step explanation:

Hello!

The study variable is

X: Pipe length.

It is known that this variable has a normal distribution and that the distribution parameter varies depending on the process used to manufacture the pipes.

Process A: μ= 200cm δ= 0.5cm

Process B: μ=201cm δ= 1cm

Process C: μ=202cm δ= 1.5cm

Pipes with a length of 200cm or more will be accepted by the utility company (X≥200), but pipes with less than 200cm length will be rejected (X<200)

a. Using Process C, you need to calculate the probability that the pipe will be rejected, symbolically:

P(X<200)

Using the distribution data of process C you have to standardize the value:

P(Z<(200-202)/1.5)= P(Z<-1.33)= 0.09176

b. The requirements change, accepting any pipe between 199 and 202, you have to calculate the probabilities of the pipes being between those lengths using the three process:

Process A:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-200)/0.5)) - P(Z≤(199-200)/0.5))

P(Z≤4) - P(Z≤-2) = 1 - 0.02275 = 0.97725

The probability of the pipe being rejected is 0.02275

Process B:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-201)/1)) - P(Z≤(199-201)/1))

P(Z≤1) - P(Z≤-2) = 0.84134 - 0.02275 = 0.81859

The probability of the pipe being rejected is 1-0.81859= 0.18141

Process C:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-202)/1.5)) - P(Z≤(199-202)/1.5))

P(Z≤0) - P(Z≤-2) = 0.5 - 0.02275 = 0.47725

The probability of the pipe being rejected is 1-0.47725= 0.52275

The pipes manufactured using process A has fewer chances of being rejected.

c.

Process A costs $140

P(X≥200)= 1 - P(X<200)= 1 - P(Z<0)= 1 - 0.5= 0.5

Process B costs $160

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1)= 1 - 0.15866= 0.84134

Process C costs $177

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1.33)= 1 - 0.09176= 0.90824

If they where to make 100 pipes:

Using process A: 100*0.5= 50 pipes will be accepted, so they'll win 50*($200-$140)= $3000

Using process B: 100*0.84134= 84.134≅ 84 pipes will beaccepted, so they'll win 84*($200-$160)= $3360

Using the process C: 100*0.90824= 80.824≅ 90 pipes will be accepted, so they'll win 90*($200-$177)= $2070

As you can see, using process B will maximize the profits.

I hope it helps!

You might be interested in
You bike for 2 hours at a speed no faster than 17.6 mph. Write an inequality that represents the possible number of miles you bi
Whitepunk [10]
Total no. of hours you spent biking = 2 hours
the speed at which you rode your bike ≤ 17.6 mph
Now,
We have,
speed =  \frac{distance}{time}

17.6 =  \frac{distance}{2}

17.6 *2=  distance

35.2=distance

So, you for given conditions, you can't travel more then 35.3 miles

So, the inequality for the given circumstances is:
x ≤ 35.2 
4 0
3 years ago
Read 2 more answers
Bradley bought 14 yellow highlighters. each highlighter cost $0.94.how much did Bradley spend?
Svetradugi [14.3K]
The answer would be 13.16$

0.94x14=13.16
6 0
3 years ago
Write the set of real numbers in interval notation. {x | x ≥ −8}
Vikentia [17]
The answer is: [-8, \infty)

Which can be written as: [-8, infinity) 

This is the interval from -8 to infinity. So -8 is our left most point on the number line and infinity being our right most. There is no boundary on the right side.

Note how the left side has a square bracket and the right side has a curved parenthesis. This isn't a typo. The square bracket tells the reader "include the endpoint -8 as part of the solution set". The parenthesis tells the reader "do NOT include the endpoint infinity as part of the solution set". 

Rule: infinity and negative infinity is always paired with a parenthesis because these aren't numbers. It's impossible to reach infinity, therefore it's impossible to include it in the set of values. If you could include it, then that implies you ran out of numbers. 
8 0
3 years ago
Sonoma bikes 5 miles to Paige's house. On a map, they measure that distance as 5/6cm. The same map shows that the mall is 3 1/2c
Elden [556K]
Simplify fraction then subtract fractions
7 0
3 years ago
What’s the answer to (9n^2+3n+4) - (6n^2+3n+3)=
Brut [27]
The answer is 3n^2+1
9n^2 - 6n^2 = 3n^2
3n-3n=0
4-3=1
8 0
3 years ago
Other questions:
  • A fruit salad contains 25 blueberriesand 20 raspberries what is the ratio of blueberries to raspberries in the fruit salad
    14·1 answer
  • Is 2/8 greater or less than 1/2
    14·2 answers
  • One half of Heather's age two years ago from now plus one-third of her age three years ago is twenty years. How old is she now?
    15·1 answer
  • 12. The overtime rate of pay which is one-and-a-half times the basic rate of $240<br> per hour is
    5·1 answer
  • A cable installer charges $45.00 per hour
    10·2 answers
  • The total width of three shortboards is 4.5 inches more than the width of two longboards. Write and solve an equation to find th
    12·1 answer
  • Equation (in vertex form) for a parabola opening upward, shifted 7 units right and 4 units down
    10·1 answer
  • A cell phone company offers two different monthly text-messaging plans as shown in the table below. For what number of text mess
    11·1 answer
  • Whether the following relation represents a function. Use pencil and paper.
    14·2 answers
  • Select the statement that correctly describes a Type I error.
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!