1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
AleksAgata [21]
3 years ago
7

Seattle-Pipes Co. produces pipes to be supplied to a Seattle utility company. The requirement of the utility company is that the

pipes need to be 200 cm long. Longer pipes are acceptable to the utility company but any pipe less than 200 cm is rejected. Seattle-Pipes loses all its production costs on pipes that are rejected. The production process is such that it has some variability in the lengths of pipes produced, and this variability can be well approximated by a Normal distribution. Seattle- Pipes can adopt one of the following three production processes:
Process A: Produces pipes with an average length of 200 cm and a standard deviation of 0.5 cm
Process B: Produces pipes with an average length of 201 cm and a standard deviation of 1 cm
Process C: Produces pipes with an average length of 202 cm and a standard deviation of 1.5 cm
a. If Seattle-Pipes adopts the third Process (Process "C'), what is the probability it will have its pipe rejected by the utility company? Enter your answer as a decimal probability (not a percent) rounded to 4 decimal places.
b. Seattle-Pipes temporarily changes its requirements and has a new requirement that it will accept any pipe of length from 199 cm to 202 cm. That is, pipes ranging in length from 199 cm to 202 cm will be accepted, others will be rejected. With this changed requirement, which production process (out of the 3) will result in the smallest percentage of rejections?
c. Seattle-Pipes earns a revenue of $200 for every pipe that gets accepted and loses all money for any pipe that is rejected. The cost of producing the pipes is $140 per pipe if the production process "A" is used, $160 per pipe if the production process "B" is used, and $177 per pipe if the production process "C" is used. Given this information, which production process would you recommend maximizing profits (revenue minus cost) if the requirement of the utility company is that pipes need to be of 200 cm (or more and any pipe shorter than 200 cm is rejected?
Mathematics
1 answer:
g100num [7]3 years ago
4 0

Answer:

Step-by-step explanation:

Hello!

The study variable is

X: Pipe length.

It is known that this variable has a normal distribution and that the distribution parameter varies depending on the process used to manufacture the pipes.

Process A: μ= 200cm δ= 0.5cm

Process B: μ=201cm δ= 1cm

Process C: μ=202cm δ= 1.5cm

Pipes with a length of 200cm or more will be accepted by the utility company (X≥200), but pipes with less than 200cm length will be rejected (X<200)

a. Using Process C, you need to calculate the probability that the pipe will be rejected, symbolically:

P(X<200)

Using the distribution data of process C you have to standardize the value:

P(Z<(200-202)/1.5)= P(Z<-1.33)= 0.09176

b. The requirements change, accepting any pipe between 199 and 202, you have to calculate the probabilities of the pipes being between those lengths using the three process:

Process A:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-200)/0.5)) - P(Z≤(199-200)/0.5))

P(Z≤4) - P(Z≤-2) = 1 - 0.02275 = 0.97725

The probability of the pipe being rejected is 0.02275

Process B:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-201)/1)) - P(Z≤(199-201)/1))

P(Z≤1) - P(Z≤-2) = 0.84134 - 0.02275 = 0.81859

The probability of the pipe being rejected is 1-0.81859= 0.18141

Process C:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-202)/1.5)) - P(Z≤(199-202)/1.5))

P(Z≤0) - P(Z≤-2) = 0.5 - 0.02275 = 0.47725

The probability of the pipe being rejected is 1-0.47725= 0.52275

The pipes manufactured using process A has fewer chances of being rejected.

c.

Process A costs $140

P(X≥200)= 1 - P(X<200)= 1 - P(Z<0)= 1 - 0.5= 0.5

Process B costs $160

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1)= 1 - 0.15866= 0.84134

Process C costs $177

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1.33)= 1 - 0.09176= 0.90824

If they where to make 100 pipes:

Using process A: 100*0.5= 50 pipes will be accepted, so they'll win 50*($200-$140)= $3000

Using process B: 100*0.84134= 84.134≅ 84 pipes will beaccepted, so they'll win 84*($200-$160)= $3360

Using the process C: 100*0.90824= 80.824≅ 90 pipes will be accepted, so they'll win 90*($200-$177)= $2070

As you can see, using process B will maximize the profits.

I hope it helps!

You might be interested in
Pls help me I am stuck
Aleonysh [2.5K]
I think the answer is Sample 4. 

Hope this helps!
4 0
3 years ago
Someone please help me
hichkok12 [17]

Answer:

364.8 ft^2.

Step-by-step explanation:

I  assume you want the area of the figure.

Total area = area of the top triangle + area of the trapezium

= 1/2 * base * height + 1/2 * height * ( sum of the parallel sides)

= 1/2 * 18 * 6 + (14/2)( 18 + 26.4)

=  54 + 310.8

= 364.8 ft^2.

3 0
2 years ago
What is this answer i need to know please and how you figured it out?
Delicious77 [7]
What is your question?????
5 0
3 years ago
Read 2 more answers
Someone plz help me
marusya05 [52]

Answer:

the answer would be 9 I think

5 0
3 years ago
last month , he sold 50 chickens and 30 ducks for $550 . This month , he sold 44 chickens and 36 ducks for $532. How much does a
Kazeer [188]
Hello there, my fellow human being!
So, the chicken costs $8 and the duck costs $5, here's why.

Let's say x is the cost of a chicken while y is the cost of a duck.
We can make two linear equations using the information above.
Last month, he sold 50 chickens and 30 ducks for $550: 50x + 30y= 550
This month, he sold 44 chicken and 36 ducks for $532: 44x + 36y = 532

50x/10 + 30y/10 = 440/10
44x/4 + 36y/4 = 532/4

5x + 3y = 44
11x + 9y = 133

So, now that we have our answer simplified, we have to use elimination to solve this system of equations. But, first we need to make sure that at least one of our variables is able to be canceled out.
Let's multiply this equation by -3.
(5x + 3y = 44) * -3.

-15x-9y=-165.

11x + 9y = 133
-15x - 9y = -165
______________
-4x/4 = -32/4
x = 8
11x + 9y = 133
11(8) + 9y = 133
88 + 9y = 133
-88 -88
________________
9y/9 = 45/9
y = 5.
4 0
3 years ago
Read 2 more answers
Other questions:
  • A forest ranger can see for a distance of 12 miles from a firetower.How many square miles can he observe?
    11·1 answer
  • What is the midpoint 50 150
    10·1 answer
  • Help please! (Explanations are preferred, since I have to know how to do this for a test)
    5·1 answer
  • Question 3(Multiple Choice Worth 3 points)
    11·1 answer
  • A basket contains apples and oranges in the ratio of 4:1. How many apples are there if the total amount of fruits is 40?
    5·2 answers
  • Can y'all help me with this?
    11·1 answer
  • The slope of the line below is -0.75. Write the equation of the line in point-
    11·1 answer
  • Solve the equation for x.
    6·1 answer
  • find the tax sales on item divide the price of the item by 20 write an algebraic expression to find the sales tax on an item tha
    9·1 answer
  • Somebody help me please asap !!p
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!