1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alinara [238K]
3 years ago
10

An A-26C aircraft has 2 piston engines driving propellers. It is climbing at a flight-path angle of 10 degrees. The aircraft wei

ghs 32,000 pounds (142,343 Newtons). For a steady climb, EACH engine must overcome how much weight in addition to the drag of the airplane?
Engineering
1 answer:
8090 [49]3 years ago
5 0

Answer:

320lbs

Explanation:

Weight = T–D / %gradient x 100

Where T = thrust and D = Drag

Due to engine out case, thrust will be from 2 engines piston i.e. 32,000x 2 = 64,000

Weight = (64,000-)/2x 100

Weight = 320lbs

You might be interested in
Question 2 (Multiple Choice Worth 3 points)
ololo11 [35]

Answer:

the car to the right

Explanation:

its in the name the RIGHT of way hope it helps good luck

6 0
4 years ago
True or False: Stress can effectively be relieved through physical activity, getting enough rest and sleep, and relaxation techn
Neko [114]

Answer:

True

Explanation:

Actually this are some of the nitty gritty answers and ways to control or stip stress, lemme explain them you see stress most of the time may come from deep thoughts that are and are pushing you to the wall, and you in your state you as you react to that which is so demanding as it makes you tense,so if at you will incorporate physical activities like running, jogging or push ups the psychological tension in you is broken as you focus so much on the activities rather than the tension, then getting enough rest cools the mind and all your thoughts settle as in your brain starts to adapt to chilling and relaxation and enough sleep will actually make ones head to be at peace because if you lack enough sleep you might have an excruciating migraine when you are stressed up and finally relaxation techniques makes the body accept the situation and then you manouver out of it as you grow strongly.

Hope this will help!

7 0
3 years ago
Read 2 more answers
Nate needs to replace the cable to his lamp. He is stripping it to connect it to the termils. What should he remember to do with
pshichka [43]

Answer: i got you its d

Explanation:had the smae question as you

5 0
3 years ago
Three tool materials (high-speed steel, cemented carbide, and ceramic) are to be compared for the same turning operation on a ba
Tpy6a [65]

Answer:

Among all three tools, the ceramic tool is taking the least time for the production of a batch, however, machining from the HSS tool is taking the highest time.

Explanation:

The optimum cutting speed for the minimum cost

V_{opt}= \frac{C}{\left[\left(T_c+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]^n}\;\cdots(i)

Where,

C,n = Taylor equation parameters

T_h =Tool changing time in minutes

C_e=Cost per grinding per edge

C_m= Machine and operator cost per minute

On comparing with the Taylor equation VT^n=C,

Tool life,

T= \left[ \left(T_t+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]}\;\cdots(ii)

Given that,  

Cost of operator and machine time=\$40/hr=\$0.667/min

Batch setting time = 2 hr

Part handling time: T_h=2.5 min

Part diameter: D=73 mm =73\times 10^{-3} m

Part length: l=250 mm=250\times 10^{-3} m

Feed: f=0.30 mm/rev= 0.3\times 10^{-3} m/rev

Depth of cut: d=3.5 mm

For the HSS tool:

Tool cost is $20 and it can be ground and reground 15 times and the grinding= $2/grind.

So, C_e= \$20/15+2=\$3.33/edge

Tool changing time, T_t=3 min.

C= 80 m/min

n=0.130

(a) From equation (i), cutting speed for the minimum cost:

V_{opt}= \frac {80}{\left[ \left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]^{0.13}}

\Rightarrow 47.7 m/min

(b) From equation (ii), the tool life,

T=\left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]}

\Rightarrow T=53.4 min

(c) Cycle time: T_c=T_h+T_m+\frac{T_t}{n_p}

where,

T_m= Machining time for one part

n_p= Number of pieces cut in one tool life

T_m= \frac{l}{fN} min, where N=\frac{V_{opt}}{\pi D} is the rpm of the spindle.

\Rightarrow T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 47.7}=4.01 min/pc

So, the number of parts produced in one tool life

n_p=\frac {T}{T_m}

\Rightarrow n_p=\frac {53.4}{4.01}=13.3

Round it to the lower integer

\Rightarrow n_p=13

So, the cycle time

T_c=2.5+4.01+\frac{3}{13}=6.74 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times6.74+\frac{3.33}{13}=\$4.75/pc

(e) Total time to complete the batch= Sum of setup time and production time for one batch

=2\times60+ {50\times 6.74}{50}=457 min=7.62 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times4.01}{457}=0.4387=43.87\%

Now, for the cemented carbide tool:

Cost per edge,

C_e= \$8/6=\$1.33/edge

Tool changing time, T_t=1min

C= 650 m/min

n=0.30

(a) Cutting speed for the minimum cost:

V_{opt}= \frac {650}{\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]^{0.3}}=363m/min [from(i)]

(b) Tool life,

T=\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]=7min [from(ii)]

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 363}=0.53min/pc

n_p=\frac {7}{0.53}=13.2

\Rightarrow n_p=13 [ nearest lower integer]

So, the cycle time

T_c=2.5+0.53+\frac{1}{13}=3.11 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times3.11+\frac{1.33}{13}=\$2.18/pc

(e) Total time to complete the batch=2\times60+ {50\times 3.11}{50}=275.5 min=4.59 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.53}{275.5}=0.0962=9.62\%

Similarly, for the ceramic tool:

C_e= \$10/6=\$1.67/edge

T_t-1min

C= 3500 m/min

n=0.6

(a) Cutting speed:

V_{opt}= \frac {3500}{\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]^{0.6}}

\Rightarrow V_{opt}=2105 m/min

(b) Tool life,

T=\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]=2.33 min

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 2105}=0.091 min/pc

n_p=\frac {2.33}{0.091}=25.6

\Rightarrow n_p=25 pc/tool\; life

So,

T_c=2.5+0.091+\frac{1}{25}=2.63 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times2.63+\frac{1.67}{25}=$1.82/pc

(e) Total time to complete the batch

=2\times60+ {50\times 2.63}=251.5 min=4.19 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.091}{251.5}=0.0181=1.81\%

3 0
4 years ago
scrapers are used to haul dirt from a borrow pit to the cap of a landfill. the estimated cycle time for the scrapers is 9.5 minu
ladessa [460]
Answer is: 12.8 because when you multiply it by the 2nd power of 8 then the scraper equals to be 12.8 in height and that’s how much each scraper requires to operate :)
7 0
3 years ago
Other questions:
  • 9 b. A sign (including the post and base) weighs 40 pounds and is
    8·1 answer
  • Determine the percent error in using the ideal gas model to determine the specific volume of (a) water vapor at 4000 lbf/in.2, 1
    13·1 answer
  • A 4 standard type L copper tube conveys propyl alcohol at 151/s. The pipe is laid out horizontally. It is 60 îm long. Calculáte
    6·1 answer
  • The device whose operation closely matches the way the clamp-on ammeter works is
    8·1 answer
  • Is any one there <br><br>I am 1m b0r3d<br>I will mark you as Brainliest
    5·2 answers
  • An adiabatic air compressor is to be powered by a direct coupled adiabatic steam turbine that is also driving a generator. Steam
    10·1 answer
  • What is the most embarrassing thing that has happened to you its OK no judging
    10·2 answers
  • Can some please help me with my questions. The Questions are in these two pictures below. I don't know how to do this question.
    14·1 answer
  • Describe the are of mechanical engineering
    6·2 answers
  • Who ever answers this gets 25 NON COSTLY points
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!