Answer:
A) 12P
Explanation:
The power produced by a force is given by the equation

where
W is the work done by the force
T is the time in which the work is done
At the beginning in this problem, we have:
W = work done by the force
T = time taken
So the power produced is

Later, the force does six times more work, so the work done now is

And this work is done in half the time, so the new time is

Substituting into the equation of the power, we find the new power produced:

So, 12 times more power.
It is E=something which leases another something equaling another something
Answer:
the answer is 12 because if your magnetic value and Electric field is 3.2 the answer will be 12
Each point along the track of one solar mass star represents the star's surface temperature and luminosity at one time.
<h3>What is the one-solar mass star?</h3>
A star having a mass equal to the mass of the Sun is called a one-solar mass star.
Its life track shows the luminous intensity as well as the surface temperature.
Learn more about one-solar mass star.
brainly.com/question/14984575
#SPJ1
Step-#1:
Ignore the wire on the right.
Find the strength and direction of the magnetic field at P,
caused by the wire on the left, 0.04m away, carrying 5.0A
of current upward.
Write it down.
Step #2:
Now, ignore the wire on the left.
Find the strength and direction of the magnetic field at P,
caused by the wire on the right, 0.04m away, carrying 8.0A
of current downward.
Write it down.
Step #3:
Take the two sets of magnitude and direction that you wrote down
and ADD them.
The total magnetic field at P is the SUM of (the field due to the left wire)
PLUS (the field due to the right wire).
So just calculate them separately, then addum up.