A leaky 10-kg bucket is lifted from the ground to a height of 14 m at a constant speed with a rope that weighs 0.5 kg/m. Initial
ly the bucket contains 42 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 14-m level. Find the work done. (use 9.8 m/s2 for g.)